Risk Identification of Building Construction Projects in Egypt

被引:25
作者
Yousri, Elhosin [1 ]
Sayed, Ahmed El Badawy [2 ]
Farag, Moataz A. M. [3 ]
Abdelalim, Ahmed Mohammed [4 ]
机构
[1] Minia Univ, Fac Engn, Menia 2431436, Egypt
[2] Minia Univ, Fac Engn, Mat Sci, Menia 2431436, Egypt
[3] Minia Univ, Fac Engn, Construct Project Management, Menia 2431436, Egypt
[4] Mataria Helwan Univ, Fac Engn, Construct Engn & Project Management, Helwan, Egypt
关键词
risk management; risk identification; construction project; quantitative risk analysis; MANAGEMENT;
D O I
10.3390/buildings13041084
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Risk identification is integral to construction management. The severe consequences of identified risk factors on time and cost performance can be addressed by improved risk management. The identification and preparation of responses to risk factors affects the risk management process directly and indirectly. Recent changes in the valuation of the Egyptian currency against foreign currencies during the last year and measures to cut down on the importation of engineering materials and equipment have had significant effects on the existing and recognized regulations concerning construction in Egypt. A pilot survey with expert engineers is a crucial step in completing research. In this research study, 15 experts were asked to discuss the collected risk factors from previous studies to verify the workability of these factors in Egypt. Thirty-five risk factors were selected during the pilot survey, which was distributed to 95 participants. To facilitate the analysis process, the collection was based on a five-point Likert scale. Therefore, redefining and arranging the risks according to the current circumstances is the main objective of this study. The proposed model identified different high-risk factors that could cumulatively affect overall performance, such as funding problems from contractors, material price fluctuations, unrealistic estimates of the duration of project activities, and shortages of construction materials in the market. Thus, to help stakeholders achieve project success, these high-risk factor components should be identified and controlled duly.
引用
收藏
页数:15
相关论文
共 35 条
[1]  
Abd El-Karim Mohamed Sayed Bassiony Ahmed, 2017, HBRC Journal, V13, P202, DOI [10.1016/j.hbrcj.2015.05.001, 10.1016/j.hbrcj.2015.05.001]
[2]   Assessing Risk Factors Affecting the Accuracy of Conceptual Cost Estimation in the Middle East [J].
Abdel-Monem, Mohamed ;
Alshaer, Kareem Tarek ;
El-Dash, Karim .
BUILDINGS, 2022, 12 (07)
[3]  
Abdelalim A.M., 2016, IPASJ International Journal of Computer Science (IIJCS), V4, P22, DOI [DOI 10.1007/978-3-030-01905-1_12, 10.1007/978-3-030-01905-112, DOI 10.1007/978-3-030-01905-112]
[4]  
Abdelalim A. M., 2021, INT J CIV STRUCT ENG, V9, P10
[5]  
Adeleke A.Q., 2019, Int J Supply Chain Manag, V8, P932
[6]   The Current Risk Management Practices and Knowledge in the Construction Industry [J].
Bahamid, Rami A. ;
Doh, Shu Ing ;
Khoiry, Muhamad Azry ;
Kassem, Mukhtar A. ;
Al-Sharafi, Mohammed A. .
BUILDINGS, 2022, 12 (07)
[7]   Risk Identification, Assessments, and Prediction for Mega Construction Projects: A Risk Prediction Paradigm Based on Cross Analytical-Machine Learning Model [J].
Banerjee Chattapadhyay, Debalina ;
Putta, Jagadeesh ;
Rao, Rama Mohan P. .
BUILDINGS, 2021, 11 (04)
[8]  
Edition P G. S., 2018, A guide to the Project Management Body of Knowledge
[9]   Estimation and prediction of construction cost index using neural networks, time series, and regression [J].
Elfahham, Yasser .
ALEXANDRIA ENGINEERING JOURNAL, 2019, 58 (02) :499-506
[10]   Analysis of Delay Impact on Construction Project Based on RII and Correlation Coefficient: Empirical Study [J].
Gebrehiwet, Tsegay ;
Luo, Hanbin .
CREATIVE CONSTRUCTION CONFERENCE 2017, CCC 2017, 2017, 196 :366-374