Factors That Impact the Implementation of Water Safety Plans-A Case Study of Brazil

被引:4
作者
Baracho, Rafaella Oliveira [1 ]
Najberg, Estela [2 ]
Scalize, Paulo Sergio [3 ]
机构
[1] Fed Univ Goias UFG, Fed Inst Educ Sci & Technol Baiano IF Baiano, Grad Program Environm Sci CIAMB, Xique Xique, Campus Xique Xique, BR-74000000 Goiania, Brazil
[2] Fed Univ Goias UFG, Fac Adm Accounting & Econ Sci, BR-74000000 Goiania, Brazil
[3] Fed Univ Goias UFG, Grad Program Environm Sci CIAMB, Grad Program Environm & Sanit Engn PPGEAS, BR-74000000 Goiania, Brazil
关键词
water safety plan; WSP preparation; implementation; water supplying management; water supply service providers; stakeholders; RISK-MANAGEMENT; SAO-PAULO; LESSONS; UTILITIES; BENEFITS; WSP;
D O I
10.3390/w15040678
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
A water safety plan (WSP) is a tool proposed by the World Health Organization (WHO) for the mitigation of risks in water consumption, and little is known about the challenges of its implementation stage. The goal of this work was to identify the facilitating factors and challenges regarding WSP implementation from a case study in Brazil. Semi-structured interviews were conducted with water supply public service providers who already have implemented such policy and with supporting institutions that helped with the process implementation. As a result, it has been identified that the WSP implementation is strongly influenced by the quality of WSP preparation process, which means that this process is the foundation of the WSP implementation; through internal management of the organization, whose administrative discontinuities thwart the actions' implementation; and through the relationship of the service provider with the external actors, which can interfere be it in the data collection or the WSP implementation scope's entirety. Lastly, it was possible to conclude that the WSP preparation process, the organization's internal management, and its relationship with external actors are the specific factors that impact the WSP implementation. The conduction and deepening of studies aiming to improve the tools of support for WSP implementation are thus recommended.
引用
收藏
页数:20
相关论文
共 48 条
[1]   Water safety plan: a novel approach to evaluate the efficiency of the water supply system in Garmsar [J].
Abolli, Samaneh ;
Alimohammadi, Mahmood ;
Zamanzadeh, Mirzaman ;
Yunesian, Masud ;
Yaghmaeian, Kamyar ;
Aghaei, Mina .
DESALINATION AND WATER TREATMENT, 2021, 211 :210-220
[2]  
Agencia Nacional De Aguas E Saneamento Basico (ANA), 2021, CONJ REC HIDR BRAS 2
[3]  
Amjad Urooj Quezon, 2016, J Water Health, V14, P816, DOI 10.2166/wh.2016.011
[4]  
[Anonymous], 2014, REL GEST 2014
[5]   Water policy implementation in the state of Sao Paulo, Brazil: Key challenges and opportunities [J].
Barbosa, Marina Costa ;
Alam, Khorshed ;
Mushtaq, Shahbaz .
ENVIRONMENTAL SCIENCE & POLICY, 2016, 60 :11-18
[6]  
Bardin L., 2009, AN LISE CONTE DO
[7]  
Bartram J., 2009, Water Safety Plan manual: Step-by-step risk management for drinking water suppliers
[8]  
Bezerra N.R., 2011, THESIS UFV VICOSA
[9]  
Diario Oficial da Uniao, 2011, DIARIO OFICIAL 1212
[10]  
Diario Oficial da Uniao, 2021, DIARIO OFICIAL UNIAO