共 50 条
- [31] Effective heuristics for the no-wait flow shop scheduling problem with total flow time minimization The International Journal of Advanced Manufacturing Technology, 2013, 66 : 1563 - 1572
- [33] A hybrid iterated greedy algorithm for the distributed no-wait flow shop scheduling problem 2017 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2017, : 9 - 16
- [34] Heuristic Algorithm Based on the Crucial Machine for the No-Wait Flow-Shop Scheduling CCDC 2009: 21ST CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-6, PROCEEDINGS, 2009, : 5121 - +
- [38] A High Quality Solution Constructive Heuristic for No-Wait Flow Shop Scheduling Problem INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2016, 15 (03): : 206 - 214