No-Wait Flow Shop scheduling problem: a systematic literature review and bibliometric analysis

被引:4
作者
Utama, Dana Marsetiya [1 ]
Umamy, Sabila Zahra [1 ]
Al-Imron, Cynthia Novel [1 ]
机构
[1] Univ Muhammadiyah Malang, Dept Ind Engn, Malang, Indonesia
关键词
No-Wait; flow shop; scheduling; permutation; hybrid; distributed; PARTICLE SWARM OPTIMIZATION; DEPENDENT SETUP TIMES; EVOLUTIONARY CLUSTERING SEARCH; ITERATED GREEDY ALGORITHM; MINIMIZING MAKESPAN; 2-MACHINE FLOWSHOP; HEURISTICS; CRITERIA; MINIMIZATION; CONSTRAINTS;
D O I
10.1051/ro/2024008
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
One of the most widely studied problems in flow shop scheduling is not allowing jobs to wait to be processed at the next stage. This constraint causes the job to be processed immediately at the next stage without waiting, so this problem is popularly called the No-Wait Flow Shop. This article aims to provide a comprehensive review of the No-Wait Flow Shop Scheduling (NWFS) problem based on a survey of published articles from 1999 to 2023. The article review is based on a systematic literature review, and bibliometric analysis is also presented based on the network processed using VOSviewer. One hundred twenty articles were collected from the Scopus database, which was reviewed based on NWFS variants, objective functions, and optimization procedures. The no-wait permutation flow shop scheduling (NWPFS) problem is a variant that researchers have widely investigated. Meta-heuristic procedures are widely applied to solve NWFS problems. In addition, the objective function of minimizing makespan is an objective function that researchers often apply. NWFS research gaps and future research trends are also presented in this paper.
引用
收藏
页码:1281 / 1313
页数:33
相关论文
共 155 条
[1]   A hybrid particle swarm optimization algorithm for a no-wait flow shop scheduling problem with the total flow time [J].
Akhshabi, M. ;
Tavakkoli-Moghaddam, R. ;
Rahnamay-Roodposhti, F. .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 70 (5-8) :1181-1188
[2]   New heuristics for m-machine no-wait flowshop to minimize total completion time [J].
Aldowaisan, T ;
Allahverdi, A .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2004, 32 (05) :345-352
[3]   MINIMIZING TOTAL TARDINESS IN NO-WAIT FLOWSHOPS [J].
Aldowaisan, Tariq ;
Allahverdi, Ali .
FOUNDATIONS OF COMPUTING AND DECISION SCIENCES, 2012, 37 (03) :149-162
[4]   No-wait flowshop scheduling problem to minimize the number of tardy jobs [J].
Aldowaisan, Tariq A. ;
Allahverdi, Ali .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 61 (1-4) :311-323
[5]   The Non-Permutation Flow-Shop scheduling problem: A literature review [J].
Alejandro Rossit, Daniel ;
Tohme, Fernando ;
Frutos, Mariano .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2018, 77 :143-153
[6]   No-wait flowshop scheduling problem with two criteria; total tardiness and makespan [J].
Allahverdi, Ali ;
Aydilek, Harun ;
Aydilek, Asiye .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 269 (02) :590-601
[7]   An improved algorithm to minimize the total completion time in a two-machine no-wait flowshop with uncertain setup times [J].
Allahverdi, Muberra .
JOURNAL OF PROJECT MANAGEMENT, 2022, 7 (01) :1-12
[8]   Distributed no-wait flow shop problem with sequence dependent setup time: Optimization of makespan and maximum tardiness [J].
Allali, Karam ;
Aqil, Said ;
Belabid, Jabrane .
SIMULATION MODELLING PRACTICE AND THEORY, 2022, 116
[9]  
Amallynda I., 2019, Jurnal Teknik Industri, P105
[10]   Two-stage no-wait hybrid flow shop with inter-stage flexibility for operating room scheduling [J].
Azaiez, Mohamed-Naceur ;
Gharbi, Anis ;
Kacem, Imed ;
Makhlouf, Yosra ;
Masmoudi, Malek .
COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 168