Practitioners' Concerns about Their Liability toward BIM Collaborative Digital Mockups: Case Study in Civil Engineering

被引:5
作者
Hochscheid, Elodie [1 ]
Falardeau, Maggie [1 ]
Lapalme, James [2 ]
Boton, Conrad [1 ]
Rivest, Louis [2 ]
机构
[1] Ecole Technol Super, Dept Construct Engn, Montreal, PQ H3C 1K3, Canada
[2] Ecole Technol Super, Dept Syst Engn, Montreal, PQ H3C 1K3, Canada
关键词
Building information model (BIM); Liability; Practitioners; Designers; Civil engineering; Product lifecycle management (PLM); Liberal professions; Digital mock-up; IMPLEMENTATION; CONSTRUCTION; INNOVATION; ISSUES;
D O I
10.1061/JCEMD4.COENG-12764
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Building information modeling (BIM) involves the use of collaborative digital mock-ups of an asset to streamline design, building, and operation processes. Collaborative work and the use of an integrated digital mock-up offers many advantages but raises several problems regarding the liability of stakeholders in construction projects. Practitioners involved in the design process of a building (engineers and architects) practice very high-liability professions for which the use of a digital mock-up implies potentially high stakes. Although liability issues have been identified in the literature as a hindrance to BIM implementation, practitioners' concerns toward their liability have only barely been investigated. In this paper, we propose to explore engineers' concerns about their liability toward using BIM collaborative digital mock-ups with a case study in civil engineering. We documented these concerns through an exploratory study consisting of semi-structured interviews. The main contribution of the paper is therefore an organized list of concerns. These include: the alignment between their way of working and professional rules, the clarity of the assignment of liabilities, and the reliability of the digital mock-up. These stem from a liability risk that practitioners perceive because of uncertainty about liability allocation and uncertainty regarding the reliability of digital mock-ups. Our research work is part of an overall effort to understand the problems faced by practitioners when implementing new practices associated with BIM and to provide solutions. The results are therefore extensively discussed in order to identify hypotheses and avenues of work to address the identified concerns. The specific context (engineers, in Quebec) and the exploratory nature of the study implies that the results are not generalizable to a wider population. However, the identified concerns may be likely to emerge in similar context like high-liability professions involved in design stages of BIM projects. This paper is a very first step toward identifying these concerns in the construction sector and must be subject to future work.
引用
收藏
页数:12
相关论文
共 59 条
[1]  
Aljarman M., 2020, EMERGING TECHNICAL R
[2]  
[Anonymous], 2014, BUSINESS VALUE BIM C
[3]  
Aram S., 2013, Integration of PLM Solutions and BIM Systems for the AEC Industry, DOI DOI 10.22260/ISARC2013/0115
[4]  
Arayici Y, 2012, J INF TECHNOL CONSTR, V17, P75
[5]  
Arensman D. B., 2012, INT J CONSTRUCT ED R, V8, P146, DOI [10.1080/15578771.2011.617808, DOI 10.1080/15578771.2011.617808]
[6]  
Ashcraft H. W., 2008, CONSTR LAW, V28, P5
[7]  
Azhar S., 2011, Leadership and Management in Engineering, V11, P241, DOI [DOI 10.1061/(ASCE)LM.1943-5630.0000127, 10.1061/(ASCE)LM.1943-5630.0000127]
[8]  
Bonanomi MMMT, 2016, P1
[9]  
Braun V., 2006, Qual Res Psychol, V3, P77, DOI [10.1191/1478088706qp063oa, DOI 10.1191/1478088706QP063OA, 10.1037/13620-004, DOI 10.1037/13620-004]
[10]  
Bucher D.F., 2020, PROC EG ICE 2020 WOR, P491