共 59 条
[1]
Aljarman M., 2020, EMERGING TECHNICAL R
[2]
[Anonymous], 2014, BUSINESS VALUE BIM C
[3]
Aram S., 2013, Integration of PLM Solutions and BIM Systems for the AEC Industry, DOI DOI 10.22260/ISARC2013/0115
[4]
Arayici Y, 2012, J INF TECHNOL CONSTR, V17, P75
[5]
Arensman D. B., 2012, INT J CONSTRUCT ED R, V8, P146, DOI [10.1080/15578771.2011.617808, DOI 10.1080/15578771.2011.617808]
[6]
Ashcraft H. W., 2008, CONSTR LAW, V28, P5
[7]
Azhar S., 2011, Leadership and Management in Engineering, V11, P241, DOI [DOI 10.1061/(ASCE)LM.1943-5630.0000127, 10.1061/(ASCE)LM.1943-5630.0000127]
[8]
Bonanomi MMMT, 2016, P1
[9]
Braun V., 2006, Qual Res Psychol, V3, P77, DOI [10.1191/1478088706qp063oa, DOI 10.1191/1478088706QP063OA, 10.1037/13620-004, DOI 10.1037/13620-004]
[10]
Bucher D.F., 2020, PROC EG ICE 2020 WOR, P491