Distributionally robust chance-constrained planning for regional integrated electricity-heat systems with data centers considering wind power uncertainty

被引:45
作者
Li, Weiwei [1 ]
Qian, Tong [1 ]
Zhang, Yin [1 ]
Shen, Yueqing [1 ]
Wu, Chenghu [1 ]
Tang, Wenhu [1 ]
机构
[1] South China Univ Technol, Sch Elect Power Engn, Guangzhou 510640, Peoples R China
基金
中国博士后科学基金; 中国国家自然科学基金;
关键词
Data center; Heat recovery; Integrated electricity-heat systems; Distributionally robust optimization; Wind uncertainty; WASTE HEAT; ENERGY; RECOVERY; DISPATCH; IMPACTS;
D O I
10.1016/j.apenergy.2023.120787
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This paper proposed an optimal planning method for regional integrated electricity-heat systems with data centers (DC-RIEHS) considering wind power uncertainty to reduce economic costs and improve system flexibility. First, a novel data center model is developed, where various flexible operating characteristics of the data center are modeled in detail, including thermal inertia of indoor air, rescheduling of delay-tolerant workloads, dynamic voltage frequency scaling technique of servers and heat recovery. The heat recovery system is specially built based on the electric cooling system of the studied data center and heat pump, which connects electric power systems and district heating systems. On this basis, a three-stage distributionally robust chance-constrained (DRCC) planning model of DC-RIEHS is proposed. It is converted into a tractable single-stage mixed-integer conic model by applying affine decision rules to hedge against wind power uncertainty. The proposed planning method determines the optimal capacities of energy equipment and the scheduling decisions of representative days considering wind power uncertainty. Simulation results demonstrate that the flexible resources in a data center can significantly reduce system costs and actively participate in coping with wind power uncertainty. Compared with the chance-constrained optimization method under Gaussian distribution, the proposed DRCC method exhibits better out-of-sample performance in terms of violation probability and system operation results under the wind uncertainty with spatial-temporal correlation.
引用
收藏
页数:21
相关论文
共 46 条
[1]  
[Anonymous], 2016, 2016 IEEE POWER ENER
[2]   Data Center Demand Response in Deregulated Electricity Markets [J].
Bahrami, Shahab ;
Wong, Vincent W. S. ;
Huang, Jianwei .
IEEE TRANSACTIONS ON SMART GRID, 2019, 10 (03) :2820-2832
[3]   Urgent action to combat climate change and its impacts (SDG 13): transforming agriculture and food systems [J].
Campbell, Bruce M. ;
Hansen, James ;
Rioux, Janie ;
Stirling, Clare M. ;
Twomlow, Stephen ;
Wollenberg, Eva .
CURRENT OPINION IN ENVIRONMENTAL SUSTAINABILITY, 2018, 34 :13-20
[4]   UPS Node-Based Workload Management for Data Centers Considering Flexible Service Requirements [J].
Cao, Fang ;
Wang, Yajing ;
Zhu, Feng ;
Cao, Yujie ;
Ding, Zhaohao .
IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 2019, 55 (06) :5533-5542
[5]   Capacity Planning of Energy Hub in Multi-Carrier Energy Networks: A Data-Driven Robust Stochastic Programming Approach [J].
Cao, Yang ;
Wei, Wei ;
Wang, Jianhui ;
Mei, Shengwei ;
Shafie-khah, Miadreza ;
Catalao, Joao P. S. .
IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2020, 11 (01) :3-14
[6]   Robust Workload and Energy Management for Sustainable Data Centers [J].
Chen, Tianyi ;
Zhang, Yu ;
Wang, Xin ;
Giannakis, Georgios B. .
IEEE JOURNAL ON SELECTED AREAS IN COMMUNICATIONS, 2016, 34 (03) :651-664
[7]  
DataCenter, 2010, SPEC REP DAT CTR REN
[8]   Using data centres for combined heating and cooling: An investigation for London [J].
Davies, G. F. ;
Maidment, G. G. ;
Tozer, R. M. .
APPLIED THERMAL ENGINEERING, 2016, 94 :296-304
[9]   Integrated Stochastic Energy Management for Data Center Microgrid Considering Waste Heat Recovery [J].
Ding, Zhaohao ;
Cao, Yujie ;
Xie, Liye ;
Lu, Ying ;
Wang, Peng .
IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 2019, 55 (03) :2198-2207
[10]   Emission-Aware Stochastic Resource Planning Scheme for Data Center Microgrid Considering Batch Workload Scheduling and Risk Management [J].
Ding, Zhaohao ;
Xie, Liye ;
Lu, Ying ;
Wang, Peng ;
Xia, Shiwei .
IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 2018, 54 (06) :5599-5608