Construction stability and reinforcement technology for the super-large rectangular pipe-jacking tunnel passing beneath the operational high-speed railway in composite stratum

被引:4
作者
Ma, Jianfei [1 ]
He, Shaohui [1 ]
Cui, Guangyao [2 ]
He, Jiaxin [1 ]
Liu, Xiabing [1 ,3 ]
机构
[1] Beijing Jiaotong Univ, Sch Civil Engn, Beijing, Peoples R China
[2] North China Univ Technol, Sch Civil Engn, Beijing, Peoples R China
[3] Guangdong Hua lu Transport Technol Co Ltd, Guangzhou, Guangdong, Peoples R China
关键词
Super-large rectangular tunnel; pipe-jacking method; high-speed railway; composite stratum; reinforcement technology; risk assessment; SHIELD;
D O I
10.1080/19475705.2023.2208720
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
The super-large rectangular underpass of the Putian Railway Station, driven by the rectangular pipe-jacking method, needs to bore cross under the operational Hangzhou-Shenzhen high-speed railway in the composite stratum. This paper aims to explore the construction stability and reinforcement technology of the super-large rectangular tunnel when excavating under the operational high-speed railway in the composite stratums. Firstly, the engineering background, the construction method, and the geological conditions are introduced in detail. Then, to evaluate the stability and safety of the construction, refined numerical models and the hard-rock ratio for the super-large rectangular pipe jacking tunnel in the composite stratum are proposed, and a construction risk assessment system comprising twenty risk factors is established. After that, three schemes are employed to guarantee the construction safety of the super-large rectangular tunnel and the high-speed railway, the reinforcement effect of schemes is derived by analyzing track stress, track settlement, safety factor, and risk re-assessment results, and the optimal scheme for the present project has been obtained. Finally, hand-dug piles + D-shaped beam has been employed for the adjacent construction of the Hangzhou-Shenzhen high-speed railway, the reinforcement technology and the automatic investigation system are proposed, thus the effectiveness of the scheme has been verified.
引用
收藏
页数:29
相关论文
共 36 条
[1]   Analytical Solution for Predicting Ground Deformation Associated with Pipe Jacking [J].
Cheng, L. Y. ;
Ariaratnam, Samuel T. ;
Chen, S. X. .
JOURNAL OF PIPELINE SYSTEMS ENGINEERING AND PRACTICE, 2017, 8 (03)
[2]  
China MoHaU-RDotPsRo, 2013, 509112013 CHIN MOHAU
[3]  
China MoHaU-RDotPsRo, 2011, COD RISK MAN UND WOR
[4]  
China MoTotPsRo, 2018, 337012018 JTG CHIN M
[5]  
China MoTotPsRo, 2011, GUID SAF RISK ASS HI
[6]  
China NRAotPsRo, 2021, 103142021 TB
[7]   Assessment of non-linear rock strength parameters for the estimation of pipe-jacking forces. Part 2. Numerical modeling [J].
Choo, C. S. ;
Ong, D. E. L. .
ENGINEERING GEOLOGY, 2020, 265
[8]  
Dai Z., 2021, KEXUE YU JISHU, V53, P95
[9]  
Editorial Department of China Journal of Highway and Transport, 2022, CHINA J HIGHW TRANSP, V35, P1
[10]  
Han B., 2020, MILITARY MED RES, V53, P161