Techno-economic and GHG mitigation assessment of concentrated solar thermal and PV systems for different climate zones

被引:7
|
作者
Ullah, Asad [1 ]
Mahmood, Mariam [1 ]
Iqbal, Sheeraz [2 ]
Sajid, Muhammad Bilal [1 ]
Hassan, Zohaib [1 ]
AboRas, Kareem M. [3 ]
Kotb, Hossam [3 ]
Shouran, Mokhtar [4 ]
Samad, Bdereddin Abdul [4 ]
机构
[1] Natl Univ Sci & Technol NUST, US Pakistan Ctr Adv Studies Energy USPCAS E, Islamabad, Pakistan
[2] Univ Azad Jammu & Kashmir, Dept Elect Engn, Muzaffarabad 13100, Ajk, Pakistan
[3] Alexandria Univ, Fac Engn, Dept Elect Power & Machine Engn, Alexandria, Egypt
[4] Cardiff Univ, Sch Engn, Magnet & Mat Res Grp, Cardiff, Wales
关键词
Solar PV; Concentrated solar power; Techno-economic assessment; Sensitivity; Environmental sustainability; POWER-PLANTS; PERFORMANCE; ENERGY; OPTIMIZATION; FEASIBILITY; GENERATION; SIMULATION; SECTOR;
D O I
10.1016/j.egyr.2023.03.109
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
In this study, energy production by two solar energy technologies, namely concentrated solar power (CSP) and photovoltaic (PV) power, is compared from a technical, economic and environmental perspective. Initially, a 50 MW CSP plant is modeled and simulated at four selected sites in Pakistan. Then, the most feasible location of the CSP plant is compared with the solar PV plant of the same capacity. The effect of the solar thermal storage size and cooling system of the CSP system is investigated, while the photovoltaic tracking system is investigated to evaluate the technical and economic performance of the power plants. Technical performance is evaluated based on energy generation and capacity factors metrics, while economic performance is evaluated with respect to levelized cost, payback period and net present value. In addition, environmental criteria such as reducing greenhouse gas emissions (GHG), saving fossil fuels, and life-cycle water consumption are evaluated. From the results, it was concluded that the CSP plant located in Quetta is technically and economically viable. The capacity factor of the CSP plant is 36.6% compared to 19.8% for the PV plant, while the solar-to-electrical efficiency of the CSP plant is 14.2% compared to 20.8% for the PV plant. The required land area is 2.77 acres/GWh for the CSP plant and 2.33 acres/GWh for the PV plant, while the net capital cost of the CSP plant is five times higher than that of the PV plant. Various design parameters are optimized to obtain the minimum levelized cost of energy (LCOE) for both CSP and PV plants. The results of CSP and PV plants indicate that the LCOE can be reduced to 11.57 cents/kWh and 4.69 cents/kWh, respectively. Thus, the CSP plant performs better from the technical point of view while the PV plant performs better from the economic perspective.(c) 2023 The Author(s). Published by Elsevier Ltd. This is an open access article under the CC BY license (http://creativecommons.org/licenses/by/4.0/).
引用
收藏
页码:4763 / 4780
页数:18
相关论文
共 50 条
  • [31] Techno-economic and operational assessment of concentrated solar power plants with a dual supporting system
    Gutierrez, R. E.
    Haro, P.
    Gomez-Barea, A.
    APPLIED ENERGY, 2021, 302
  • [32] Techno-economic analysis of a hybrid district heating with borehole thermal storage for various solar collectors and climate zones in Pakistan
    Ushamah, Hafiz Muhammad
    Ahmed, Naveed
    Elfeky, K. E.
    Mahmood, Mariam
    Qaisrani, Mumtaz A.
    Waqas, Adeel
    Zhang, Qian
    RENEWABLE ENERGY, 2022, 199 : 1639 - 1656
  • [33] Hybrid PV and solar-thermal systems for domestic heat and power provision in the UK: Techno-economic considerations
    Herrando, Maria
    Markides, Christos N.
    APPLIED ENERGY, 2016, 161 : 512 - 532
  • [34] Techno-Economic Analysis of a Concentrated Solar Polygeneration Plant in Jordan
    Kiwan, S.
    Venezia, L.
    Montagnino, F. M.
    Paredes, F.
    Damseh, R.
    JORDAN JOURNAL OF MECHANICAL AND INDUSTRIAL ENGINEERING, 2018, 12 (01): : 1 - 6
  • [35] A Review of Floating PV Systems With a Techno-Economic Analysis
    Niccolai, Alessandro
    Grimaccia, Francesco
    Di Lorenzo, Gianfranco
    Araneo, Rodolfo
    Ughi, Federico
    Polenghi, Marcello
    IEEE JOURNAL OF PHOTOVOLTAICS, 2024, 14 (01): : 23 - 34
  • [36] Techno-economic assessment of Solar Photovoltaic Plants
    Jahnavi, B. P.
    Mathew, Rohit K.
    Ashok, S.
    2022 IEEE 19TH INDIA COUNCIL INTERNATIONAL CONFERENCE, INDICON, 2022,
  • [37] Techno-economic and GHG mitigation analyses based on regional and seasonal variations of non-concentrating solar thermal collectors in textile sector of Pakistan
    Ali, Elia Nauroz
    Liaquat, Rabia
    Ali, Majid
    Waqas, Adeel
    Shahzad, Nadia
    RENEWABLE ENERGY FOCUS, 2022, 42 : 165 - 177
  • [38] SOLAR PV FOR SWEDISH PROSUMERS - A COMPREHENSIVE TECHNO-ECONOMIC ANALYSIS
    Sommerfeldt, Nelson
    PROCEEDINGS OF THE 11TH ISES EUROSUN 2016 CONFERENCE, 2017, : 1339 - 1347
  • [39] Optimal techno-economic energy coordination of solar PV water pumping irrigation systems
    Elnozahy, Ahmed
    Abdel-Salam, Mazen
    Abo-Elyousr, Farag K.
    ENERGY, 2024, 288
  • [40] Techno-economic assessment of concentrated solar power technologies integrated with thermal energy storage system for green hydrogen production
    Soni, Neelesh
    Reddy, K. S.
    INTERNATIONAL JOURNAL OF HYDROGEN ENERGY, 2024, 72 : 1184 - 1203