Prediction method and experimental verification of vibration response caused by underground high-speed railways

被引:3
作者
Li, Hao [1 ]
Yang, Wei-guo [1 ]
Liu, Pei [1 ,2 ]
Wang, Meng [1 ]
机构
[1] Beijing Jiaotong Univ, Sch Civil Engn, Beijing 10044, Peoples R China
[2] Beijing Jiaotong Univ, Beijings Key Lab Struct Wind Engn & Urban Wind En, Beijing, Peoples R China
基金
国家重点研发计划;
关键词
Underground high-speed railway; vibration response; transfer ratio; prediction; hammer excitation; TRACK-GROUND VIBRATIONS; MODEL;
D O I
10.1177/14613484221132117
中图分类号
O42 [声学];
学科分类号
070206 ; 082403 ;
摘要
Aiming at the problem of vibration caused by underground high-speed railways, this paper proposes a vibration prediction method based on the multi-point transfer ratio in the frequency domain. The transmission information of vibration signals from the tunnel to the surface was obtained by an in situ hammer excitation test, and the acceleration response near the vibration source was calculated via high-precision vehicle-track coupling analysis and a finite element model of the tunnel. Then, the superposition operation was carried out in consideration of the position change of the train, and the surface vibration response caused by the underground high-speed railway was finally predicted. An in situ vibration test was carried out near an underground high-speed railway line and the measured data were compared with the predicted data. The results demonstrate that the predicted and measured time domain peaks were similar, and the main vibration frequencies were both located in the range of 30-70 Hz. Moreover, the 1/3-octave spectra were also very similar, and the root mean square error of acceleration and the Z vibration level error were less than 1.9%. The comparison results show that the proposed method can be used to predict the vibration response caused by the operation of underground high-speed railways with high precision.
引用
收藏
页码:452 / 469
页数:18
相关论文
共 50 条
  • [31] Field and numerical investigations on the environmental vibration and the influence of hill on vibration propagation induced by high-speed trains
    Zheng, Haizhong
    Yan, Wujian
    CONSTRUCTION AND BUILDING MATERIALS, 2022, 357
  • [32] Vibroacoustic response of a high-speed train extruded profile under fluid-induced vibration
    Li, Ye
    Zhang, Yumei
    Tang, Zhao
    Pan, Aipeng
    JOURNAL OF VIBRATION AND CONTROL, 2024, 30 (1-2) : 64 - 75
  • [33] A partial similitude method for vibration responses of rotor systems: Numerical and experimental verification
    Li, Lei
    Luo, Zhong
    He, Fengxia
    Ding, Zhe
    Sun, Kai
    INTERNATIONAL JOURNAL OF MECHANICAL SCIENCES, 2021, 208
  • [34] High-Speed Multiphase Verification and Code-to-Code Comparison
    Sayad, Andrew
    Rabinovitch, Jason
    Viqueira-Moreira, Manuel
    Patel, Monal
    Brehm, Christoph
    Sarker, Anik
    Jarrahbashi, Dorrin
    AIAA AVIATION FORUM AND ASCEND 2024, 2024,
  • [35] Dynamic behaviour of railway poles built on bridges under train passage in high-speed railways and a simple evaluation method
    Matsuoka, Kodai
    Tsunemoto, Mizuki
    Tokunaga, Munemasa
    ENGINEERING STRUCTURES, 2022, 257
  • [36] Aural comfort prediction method for high-speed trains under complex tunnel environments
    Xie, Pengpeng
    Peng, Yong
    Wang, Tiantian
    Wu, Zhifa
    Yao, Song
    Yang, Mingzhi
    Yi, Shengen
    TRANSPORTATION RESEARCH PART D-TRANSPORT AND ENVIRONMENT, 2020, 81
  • [37] Prediction method for maize kernel impact breakage based on high-speed camera and FEM
    Tang, Han
    Zhu, Guixuan
    Wang, Ziheng
    Xu, Wenlong
    Xu, Changsu
    Wang, Jinwu
    POWDER TECHNOLOGY, 2024, 444
  • [38] Study on the phenomenon of rail corrugation on high-speed rail based on the friction-induced vibration and feedback vibration
    Cui, Xiaolu
    Cheng, Zhi
    Yang, Zongchao
    Huang, Bo
    Du, Zixue
    VEHICLE SYSTEM DYNAMICS, 2022, 60 (02) : 413 - 432
  • [39] Dynamic soil arching in piled embankment under train load of high-speed railways
    Niu, Tingting
    Yang, Yule
    Ma, Qianli
    Zou, Jiuqun
    Lin, Bin
    EARTHQUAKE ENGINEERING AND ENGINEERING VIBRATION, 2023, 22 (03) : 719 - 730
  • [40] Influence of Pier Settlement on Structural Stress of Longitudinal Connected Track in High-Speed Railways
    Fang, Hui
    ADVANCES IN CIVIL ENGINEERING, 2020, 2020