Integration of planning, scheduling, and control of no-wait batch plant

被引:4
|
作者
Ji, Nan [1 ]
Gu, Xingsheng [1 ]
机构
[1] East China Univ Sci & Technol, Key Lab Smart Mfg Energy Chem Proc, Minist Educ, Meilong Rd 130, Shanghai 200237, Peoples R China
关键词
Process control; Scheduling; Production planning; Integration of planning; Scheduling and control; Batch plant; DYNAMIC OPTIMIZATION; FEASIBILITY ANALYSIS; TOTAL TARDINESS; DESIGN;
D O I
10.1016/j.compchemeng.2023.108467
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The batch process plays an important role in industrial production. Among them, production processes that have specific requirements for operational continuity in each processing stage should consider the no-wait constraint to meet the production reality. The batch process with a no-wait constraint is a typical NP-hard problem. In this work, we propose a framework for the integration of planning, scheduling, and control. We also propose a decomposition method with an improved genetic algorithm to solve the integration problem of scheduling and control for the no-wait batch process. The integrated formulation represents a typical mixed logic dynamic optimization (MLDO) problem, which involves logical disjunctions and operational dynamics. Then, we address the integrated problem as a grey-box optimization problem, using data-driven feasibility analysis and surrogate models to approximate the unknown black-box constraints. Finally, we test specific production instances to demonstrate the feasibility and superiority of the proposed integration model of the no-wait batch process and optimization algorithm.
引用
收藏
页数:19
相关论文
共 50 条