Process control;
Scheduling;
Production planning;
Integration of planning;
Scheduling and control;
Batch plant;
DYNAMIC OPTIMIZATION;
FEASIBILITY ANALYSIS;
TOTAL TARDINESS;
DESIGN;
D O I:
10.1016/j.compchemeng.2023.108467
中图分类号:
TP39 [计算机的应用];
学科分类号:
081203 ;
0835 ;
摘要:
The batch process plays an important role in industrial production. Among them, production processes that have specific requirements for operational continuity in each processing stage should consider the no-wait constraint to meet the production reality. The batch process with a no-wait constraint is a typical NP-hard problem. In this work, we propose a framework for the integration of planning, scheduling, and control. We also propose a decomposition method with an improved genetic algorithm to solve the integration problem of scheduling and control for the no-wait batch process. The integrated formulation represents a typical mixed logic dynamic optimization (MLDO) problem, which involves logical disjunctions and operational dynamics. Then, we address the integrated problem as a grey-box optimization problem, using data-driven feasibility analysis and surrogate models to approximate the unknown black-box constraints. Finally, we test specific production instances to demonstrate the feasibility and superiority of the proposed integration model of the no-wait batch process and optimization algorithm.
机构:
East China Univ Sci & Technol, Key Lab Smart Mfg Energy Chem Proc, Minist Educ, Shanghai 200237, Peoples R ChinaEast China Univ Sci & Technol, Key Lab Smart Mfg Energy Chem Proc, Minist Educ, Shanghai 200237, Peoples R China
Ji, Nan
Gu, Xingsheng
论文数: 0引用数: 0
h-index: 0
机构:
East China Univ Sci & Technol, Key Lab Smart Mfg Energy Chem Proc, Minist Educ, Shanghai 200237, Peoples R ChinaEast China Univ Sci & Technol, Key Lab Smart Mfg Energy Chem Proc, Minist Educ, Shanghai 200237, Peoples R China