Investigation of the Effect of Air Layer Thickness on the Thermal Performance of the PCM Integrated Roof

被引:4
作者
Bhamare, Dnyandip K. [1 ]
Rathod, Manish K. [1 ]
Banerjee, Jyotirmay [1 ]
Arici, Muslum [2 ]
机构
[1] Sardar Vallabhbhai Natl Inst Technol, Mech Engn Dept, Surat 395007, Gujarat, India
[2] Kocaeli Univ, Engn Fac, Mech Engn Dept, TR-41001 Kocaeli, Turkiye
关键词
PCM integrated roof; air layer; MKR index; peak value temperatures; solar heat gain reduction rate; PHASE-CHANGE MATERIAL; BUILDING ELEMENTS; REDUCTION; WALL; SELECTION; BEHAVIOR; PROPOSAL; COMFORT; INDEX;
D O I
10.3390/buildings13020488
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Recently, Phase Change Materials (PCM) have become more prevalent in improving buildings' thermal management. The relative location of the PCM layer is a valuable measure for assessing the thermal performance of building envelopes, in addition to meteorological circumstances and PCM qualities. The optimum air layers between the PCM layer and roof may significantly reduce energy consumption in buildings. In this regard, the influence of air gap layer thickness on the thermal performance of a PCM (HS 29) integrated roof of the test room is investigated experimentally. Experiments are carried out for an unconditioned test room located on the terrace of a laboratory in Surat, India, considering various air layer thickness values (0, 2, 4, and 6 cm) and a fixed PCM layer thickness. Different configurations within the research, including no- PCM and PCM with 0, 2, 4, and 6 cm air layer thickness, are investigated for the effects of diurnal change in room temperature. Results are evaluated based on the peak value, valley value temperatures of different roof layers, and an index (MKR, Measure of Key Response). It is observed that the maximum temperature difference between the PCM-integrated test room and the non-PCM test room is 4 degrees C to 7 degrees C. Results showed that, with a higher MKR index of 8.83, a PCM-integrated roof with a 2 cm air layer thickness could reduce the diurnal room temperature variations compared with the non-PCM test room. This conclusion from the current research demonstrates the significance of an air layer provided between the PCM layer and the roof of the building.
引用
收藏
页数:14
相关论文
共 33 条
  • [1] Al-Sanea S.A., 2003, Journal of Building Physics, V26, P285, DOI [DOI 10.1177/109719603027973, 10.1177/109719603027973]
  • [2] Efficient utilization of PCM in building envelope in a hot environment condition
    Alshuraiaan B.
    [J]. International Journal of Thermofluids, 2022, 16
  • [3] [Anonymous], 2013, ENG REF
  • [4] [Anonymous], 2013, 2013 APR ANN EN OUTL
  • [5] PCM integrated to external building walls: An optimization study on maximum activation of latent heat
    Arici, Muslum
    Bilgin, Feyza
    Nizetic, Sandro
    Karabay, Hasan
    [J]. APPLIED THERMAL ENGINEERING, 2020, 165
  • [6] Energy refurbishment of existing buildings through the use of phase change materials: Energy savings and indoor comfort in the cooling season
    Ascione, Fabrizio
    Bianco, Nicola
    De Masi, Rosa Francesca
    de' Rossi, Filippo
    Vanoli, Giuseppe Peter
    [J]. APPLIED ENERGY, 2014, 113 : 990 - 1007
  • [7] Ben Khedher N, 2018, ENG TECHNOL APPL SCI, V8, P2663
  • [8] Proposal of a unique index for selection of optimum phase change material for effective thermal performance of a building envelope
    Bhamare, Dnyandip K.
    Rathod, Manish K.
    Banerjee, Jyotirmay
    [J]. SOLAR ENERGY, 2021, 218 : 129 - 141
  • [9] Selection of phase change material and establishment of thermophysical properties of phase change material integrated with roof of a building using Measure of Key Response index: Proposal of a new parameter
    Bhamare, Dnyandip K.
    Rathod, Manish K.
    Banerjee, Jyotirmay
    [J]. JOURNAL OF ENERGY STORAGE, 2020, 32
  • [10] Numerical model for evaluating thermal performance of residential building roof integrated with inclined phase change material (PCM) layer
    Bhamare, Dnyandip K.
    Rathod, Manish K.
    Banerjee, Jyotirmay
    [J]. JOURNAL OF BUILDING ENGINEERING, 2020, 28