Change order effects on labor productivity and mitigation the effects by developing policies using system dynamic modeling: a case study in a construction project

被引:0
作者
Nila, Nadira Islam [1 ]
Akter, Jhumana [1 ]
Hossain, Md. Mehrab [1 ]
机构
[1] Khulna Univ Engn & Technol, Dept Bldg Engn & Construct Management, Khulna, Bangladesh
关键词
Construction delay; Change orders; Labor productivity; System dynamic model; Statistical analysis; MANAGEMENT; IMPACT;
D O I
10.1108/IJBPA-11-2022-0184
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
PurposeChange orders are a typical occurrence in building projects. Change orders indirectly affect labor productivity, resulting in a significant delay in the completion of a building project. Change orders cause labor productivity losses that are difficult to describe, establish and account for contractors and subcontractors. This study aimed to look at the influence of change orders on labor productivity and develop methods to mitigate their adverse effects.Design/methodology/approachTo assess the change orders' impact on productivity levels a system dynamic model was developed and devise ways were developed to counteract these negative impacts in this research. The impact of change orders on labor productivity and project time was then controlled using techniques established. Finally, a case study of KUET's hall extension was chosen, and the model and principles developed were implemented.FindingsThis study established that if the project delivery date is set and change orders are occurring often, labor productivity will be impacted. With adequate monitoring and supplemental management techniques, it can be reduced by prolonging the project.Originality/valueThe developed policies aid to mitigate the effect of change orders on labor productivity.
引用
收藏
页数:19
相关论文
共 39 条
  • [1] AIA, US
  • [2] Causes, Effects, Benefits, and Remedies of Change Orders on Public Construction Projects in Oman
    Alnuaimi, Ali S.
    Taha, Ramzi A.
    Al Mohsin, Mohammed
    Al-Harthi, Ali S.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2010, 136 (05) : 615 - 622
  • [3] Frequency of Change Orders in Highway Construction Using Alternate Count-Data Modeling Methods
    Anastasopoulos, Panagiotis Ch.
    Labi, Samuel
    Bhargava, Abhishek
    Bordat, Claire
    Mannering, Fred
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2010, 136 (08) : 886 - 893
  • [4] Anderson S.D., 1997, CONSTR C 5 MAN ENG C
  • [5] Causes of delay in large construction projects
    Construction Engineering and Management Department, King Fahd University of Petroleum and Minerals, Box # 680, Dhahran, 31261, Saudi Arabia
    [J]. Int. J. Proj. Manage., 2006, 4 (349-357): : 349 - 357
  • [6] Investigating the causes of construction delay on the perspective of organization-sectors involved in the construction industry of Bangladesh
    Assafi, Mohammad Nafe
    Hoque, Md Ikramul
    Hossain, Md Mehrab
    [J]. INTERNATIONAL JOURNAL OF BUILDING PATHOLOGY AND ADAPTATION, 2024, 42 (04) : 788 - 817
  • [7] Assem I., 2002, ESTIMATING PRODUCTIV
  • [8] Effects of Last Planner System Practices on Social Networks and the Performance of Construction Projects
    Castillo, Tito
    Alarcon, Luis F.
    Salvatierra, Jose Luis
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018, 144 (03)
  • [9] Cooper K.G., 2007, WILEY GUIDE PROJECT, P347
  • [10] Dolage D.A. R., 2013, Engineer - Journal of the institution of engineers Sri Lanka, V46