Risk-supported case-based reasoning approach for cost overrun estimation of water-related projects using machine learning

被引:7
作者
Sohrabi, Hossein [1 ]
Noorzai, Esmatullah [2 ]
机构
[1] Pars Univ Architecture & Art, Dept Project & Construct Management, Tehran, Iran
[2] Univ Tehran, Dept Project & Construct Management, Tehran, Iran
关键词
Construction planning; Estimating; Project management; Risk management; TIME-SERIES; MODEL; PREDICTION;
D O I
10.1108/ECAM-05-2022-0450
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose The present study aims to develop a risk-supported case-based reasoning (RS-CBR) approach for water-related projects by incorporating various uncertainties and risks in the revision step. Design/methodology/approach The cases were extracted by studying 68 water-related projects. This research employs earned value management (EVM) factors to consider time and cost features and economic, natural, technical, and project risks to account for uncertainties and supervised learning models to estimate cost overrun. Time-series algorithms were also used to predict construction cost indexes (CCI) and model improvements in future forecasts. Outliers were deleted by the pre-processing process. Next, datasets were split into testing and training sets, and algorithms were implemented. The accuracy of different models was measured with the mean absolute percentage error (MAPE) and the normalized root mean square error (NRSME) criteria. Findings The findings show an improvement in the accuracy of predictions using datasets that consider uncertainties, and ensemble algorithms such as Random Forest and AdaBoost had higher accuracy. Also, among the single algorithms, the support vector regressor (SVR) with the sigmoid kernel outperformed the others. Originality/value This research is the first attempt to develop a case-based reasoning model based on various risks and uncertainties. The developed model has provided an approving overlap with machine learning models to predict cost overruns. The model has been implemented in collected water-related projects and results have been reported.
引用
收藏
页码:544 / 570
页数:27
相关论文
共 91 条
  • [1] Artificial intelligence in the construction industry: A review of present status, opportunities and future challenges
    Abioye, Sofiat O.
    Oyedele, Lukumon O.
    Akanbi, Lukman
    Ajayi, Anuoluwapo
    Delgado, Juan Manuel Davila
    Bilal, Muhammad
    Akinade, Olugbenga O.
    Ahmed, Ashraf
    [J]. JOURNAL OF BUILDING ENGINEERING, 2021, 44
  • [2] Ahiaga-Dagbui D. D., 2012, Neural networks for modelling the final target cost of water projects
  • [3] Performance evaluation of normalization-based CBR models for improving construction cost estimation
    Ahn, Joseph
    Ji, Sae-Hyun
    Ahn, Sung Jin
    Park, Moonseo
    Lee, Hyun-Soo
    Kwon, Nahyun
    Lee, Eul-Bum
    Kim, Yonggu
    [J]. AUTOMATION IN CONSTRUCTION, 2020, 119
  • [4] Artificial Neural Network Model for Cost Estimation: City of Edmonton's Water and Sewer Installation Services
    Alex, Dinu Philip
    Al Hussein, Mohamed
    Bouferguene, Ahmed
    Fernando, Siri
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2010, 136 (07) : 745 - 756
  • [5] An intelligent hybrid model of neuro Wavelet, time series and Recurrent Kalman Filter for wind speed forecasting
    Aly, Hamed H. H.
    [J]. SUSTAINABLE ENERGY TECHNOLOGIES AND ASSESSMENTS, 2020, 41
  • [6] Causes of cost overruns in building construction projects in Asian countries; Iran as a case study
    Amini, Shima
    Rezvani, Alireza
    Tabassi, Mohsen
    Sadati, Seyed Saeed Malek
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 30 (07) : 2739 - 2766
  • [7] [Anonymous], 2013, GUIDE PROJECT MANAGE, V5
  • [8] [Anonymous], 2016, Journal of Construction in Developing Countries, V21, P51, DOI [10.21315/jcdc2016.21.1.4, DOI 10.21315/JCDC2016.21.1.4, 10.21315/jcdc2016.21.1]
  • [9] Expediting Life Cycle Cost Analysis of Infrastructure Assets under Multiple Uncertainties by Deep Neural Networks
    Asghari, Vahid
    Hsu, Shu-Chien
    Wei, Hsi-Hsien
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2021, 37 (06)
  • [10] Estimated Cost at Completion: Integrating Risk into Earned Value Management
    Babar, Suqrat
    Thaheem, Muhammad Jamaluddin
    Ayub, Bilal
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (03)