Case Study on the Interaction Between Rectangular Pipe Jacking Control and Ground Settlement in Silty Clay

被引:9
作者
Li, Mingyu [1 ]
Yang, Jinghui [1 ]
Zeng, Li [1 ]
Jin, Junwei [1 ]
Liu, Yuhong [2 ]
机构
[1] Zhengzhou Univ, Sch Water Conservancy & Civil Engn, 100 Sci Ave, Zhengzhou, Henan, Peoples R China
[2] Shanghai City Construct Municipal Engn Grp Co, 1099 Wanping South Rd, Shanghai, Peoples R China
关键词
Tunnel engineering; Rectangular pipe jacking; Ground settlement; Deformation law; Distribution characteristics; Influencing factors; CONSTRUCTION; PRESSURE; TUNNEL; PREDICTION; SLURRY; FORCE; MODEL;
D O I
10.1007/s40999-023-00830-8
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A soil pressure balance rectangular pipe jacking project is investigated to find out the interaction of jacking control and ground settlement in Zhengzhou, China. The dimension of the rectangular pipe jacking excavation face is 6.94 m (width) x 4.24 m (height). The tunnel is 35.6 m long and 10.6 m beneath the ground in silty clay strata. The trajectory of the pipe jacking tunneling machine was measured during the whole construction. Meanwhile the construction sets like cutter pressure, jacking force, and grouting pressure were measured with sensors on the pipe jacking machine. The ground settlement was obtained throughout the rectangular pipe jacking process. The results showed that ground settlement variation started from 7.46 m in front of the cutter and ended with 9.79 m away from cutter. The ground settlement can be divided into four phases according to the settlement increasing pattern which is consistent with the distance from the cutter. The ratio of these four phases settlement is approximately 3:3:2:2. The trajectory of the jacking pipe tail has a nonnegligible effect on the settlement distribution characteristics of the ground. The vertical trajectory variation induces lager settlement increasing than horizontal trajectory. Ground settlement increases during the whole progress, but the increasing amplitude decreases with the increasing of cutter pressure, jacking force and grouting.
引用
收藏
页码:1447 / 1462
页数:16
相关论文
共 54 条
[1]   An improved method to calculate the vertical earth pressure for deep shield tunnel in Shanghai soil layers [J].
Chen, Kai-Hua ;
Peng, Fang-Le .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2018, 75 :43-66
[2]   Long rectangular box jacking project: A case study [J].
Chen, Xiaolong ;
Ma, Baosong ;
Najafi, Mohammad ;
Zhang, Peng .
UNDERGROUND SPACE, 2021, 6 (02) :101-125
[3]   Main engineering problems and countermeasures in ultra-long-distance rock pipe jacking project: Water pipeline case study in Chongqing [J].
Deng, Zhiyun ;
Liu, Xinrong ;
Zhou, Xiaohan ;
Yang, Qinghui ;
Chen, Peng ;
de la Fuente, Albert ;
Ren, Lianxi ;
Du, Libing ;
Han, Yafeng ;
Xiong, Fei ;
Yan, Ru .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2022, 123
[4]   Analysis and application of friction calculation model for long-distance rock pipe jacking engineering [J].
Deng, Zhiyun ;
Liang, Ninghui ;
Liu, Xinrong ;
de la Fuente, Albert ;
Lin, Peng ;
Peng, Haoyang .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2021, 115
[5]   Impact of the shield machine's performance parameters on the tunnel lining behaviour and settlements [J].
Do, Ngoc Anh ;
Dias, Daniel ;
Vu, Trung Thanh ;
Dang, Van Kien .
ENVIRONMENTAL EARTH SCIENCES, 2021, 80 (16)
[6]  
Guo Rui, 2018, Journal of Highway and Transportation Research and Development (English Edition), V12, P38, DOI 10.1061/jhtrcq.0000623
[7]   Interpretable predictive model for shield attitude control performance based on XGboost and SHAP [J].
Hu, Min ;
Zhang, Haolan ;
Wu, Bingjian ;
Li, Gang ;
Zhou, Li .
SCIENTIFIC REPORTS, 2022, 12 (01)
[8]   A real-life stability model for a large shield-driven tunnel in heterogeneous soft soils [J].
Xinyu Hu ;
Zixin Zhang ;
Scott Kieffer .
Frontiers of Structural and Civil Engineering, 2012, 6 (2) :176-187
[9]   A method to estimate the jacking force for pipe jacking in sandy soils [J].
Ji, Xinbo ;
Zhao, Wen ;
Ni, Pengpeng ;
Barla, Marco ;
Han, Jianyong ;
Jia, Pengjiao ;
Chen, Yang ;
Zhang, Chaozhe .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2019, 90 :119-130
[10]   Case Study of the Largest Concrete Earth Pressure Balance Pipe-Jacking Project in the World [J].
Jiang, Xi ;
Zhang, Xuehui ;
Wang, Shuai ;
Bai, Yun ;
Huang, Baoshan .
TRANSPORTATION RESEARCH RECORD, 2022, 2676 (07) :92-105