The development of a performance measurement system for indirect procurement: a Delphi study

被引:0
作者
Darom, Michail [1 ]
Plant, Eoin [2 ]
机构
[1] Univ South Wales, Business Sch, Pontypridd, Wales
[2] Edinburgh Napier Univ, Business Sch, Craiglockhart Campus, Edinburgh, Scotland
关键词
Performance measurement; Procurement; Balanced scorecard; Metrics; Delphi study; Key performance indicators; INTERNAL SERVICE QUALITY; SUPPLY CHAIN MANAGEMENT; BALANCED SCORECARD; INFORMATION-SYSTEMS; METRICS; DESIGN; PERCEPTIONS; INDICATORS; PERSPECTIVE; FRAMEWORK;
D O I
10.1108/MBE-05-2019-0047
中图分类号
F [经济];
学科分类号
02 ;
摘要
PurposeThis study aims to address the current gap in knowledge of indirect procurement performance management. It attempts to argue the need for a specific and tailored performance management approach for the indirect procurement function that incorporates a balanced approach, beyond financial measures.Design/methodology/approachThe case study approach evaluated key performance indicators from a balanced scorecard (BSC) perspective in the development of a performance measurement system (PMS) for a Middle Eastern university's indirect procurement division. It initially reviewed the literature to assess potential indicators for this context. It used vision and mission statement analysis alongside expert interviews to augment the literature. The candidate indicators were then evaluated and ranked by an expert panel through applying a four-round Delphi technique.FindingsTwenty-nine procurement-specific indicators are suggested in a BSC framework. The five highest-ranked indicators were not in the financial perspective unlike other BSC studies in the broader field of supply chain management (SCM).Practical implicationsThe study suggests a framework and indicators for a procurement PMS for practitioners to consider. It also highlights there is no one-size-fits-all and that organisations need to tailor PM to the organisation and divisional strategy and operational needs. This study aids the development of guidelines for executives and procurement management that wish to develop indicators and a PMS.Originality/valueThis study contributes to knowledge by partly addressing the under-researched field of indirect procurement PM. The literature suggested that various roles in SCM require specific PM indicators. This study puts forward a BSC framework with 29 indicators specifically for indirect procurement. Fourteen of these indicators were derived from non-literature sources. This study enhances knowledge and contributes to the limited debate and evidence on indirect procurement PM and the broader PM literature.
引用
收藏
页码:579 / 601
页数:23
相关论文
共 102 条
  • [1] Akkawuttiwanich P., 2017, International Journal of Supply Chain Management, V6, P172
  • [2] Review of supply chain performance measurement systems: 1998-2015
    Balfaqih, Hasan
    Nopiah, Zulkifli Mohd.
    Saibani, Nizaroyani
    Al-Nory, Malak T.
    [J]. COMPUTERS IN INDUSTRY, 2016, 82 : 135 - 150
  • [3] Barrows E., 2011, Managing performance in turbulent times: analytics and insight, V1st
  • [4] Measuring supply chain performance
    Beamon, BM
    [J]. INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 1999, 19 (3-4) : 275 - 292
  • [5] Testing the EFQM model as a framework to measure a company's procurement performance
    Belvedere, Valeria
    Grando, Alberto
    Legenvre, Herve
    [J]. TOTAL QUALITY MANAGEMENT & BUSINESS EXCELLENCE, 2018, 29 (5-6) : 633 - 651
  • [6] Bernardo N., 2018, Agile Procurement: Volume I: Adding Value with Lean Processes
  • [7] Performance measurement of supply chain management: A balanced scorecard approach
    Bhagwat, Rajat
    Sharma, Milind Kumar
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2007, 53 (01) : 43 - 62
  • [8] Biazzo S., 2012, Performance Measurement with the Balanced Scorecard: A Practical Approach to Implementation within SMEs
  • [9] Performance measurement in the food supply chain: a balanced scorecard approach
    Bigliardi, Barbara
    Bottani, Eleonora
    [J]. FACILITIES, 2010, 28 (5-6) : 249 - 260
  • [10] Bititci U.S., 1994, MANAGE DECIS, V32, P16, DOI DOI 10.1108/00251749410065088