An interactive design change methodology using a BIM-based Virtual Reality and Augmented Reality

被引:24
作者
Panya, David Stephen [1 ]
Kim, Taehoon [1 ]
Choo, Seungyeon [1 ]
机构
[1] Kyungpook Natl Univ, Sch Architecture, Daegu, South Korea
来源
JOURNAL OF BUILDING ENGINEERING | 2023年 / 68卷
关键词
Building information modeling; Virtual reality; Augmented reality; Change management; CONSTRUCTION; REWORK; MODEL;
D O I
10.1016/j.jobe.2023.106030
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Changes in design and construction constitute variations from the original design prepared by a design team and are inevitable. Despite the fact that rework has been identified as having adverse effects on performance, there have been limited studies on how to mitigate rework in design changes. Despite improving change management, Building Information Modeling (BIM) is insuf-ficient in mitigating rework. However, the convergence of the capabilities of BIM, Virtual Reality (VR), and Augmented Reality (AR) are integrated solutions to reduce the impact of rework in de-sign change. In this research, we improve the requirements for reworking design changes, which include redesign, information flow, and delivery for users with no experience with BIM. For inter-active design change with BIM in VR and AR, the proposed methodology integrates BIM, as-built data from web sources, and VR and AR functions using game engines and programming. In VR and AR, BIM objects are used to create multiple variants that are matched with BIM databases that provide options for design changes. The interactive design change platform is validated in a VR and AR environment and presented multiple design change options for wall elements based on a set required change factor of a building project. This paper highlights the need for a change platform that reduces the rework of design changes in BIM through VR and AR in three main ar-eas redesign, maintaining the flow of information and delivery of solutions for design changes. The VR and AR proposed solution to design change improves rework collaboration and communi-cation among stakeholders of a building project.
引用
收藏
页数:11
相关论文
共 26 条
  • [1] BIM-augmented reality integrated approach to risk management
    Alirezaei, Sahar
    Taghaddos, Hosein
    Ghorab, Khashayar
    Tak, Ala Nekouvaght
    Alirezaei, Sepideh
    [J]. AUTOMATION IN CONSTRUCTION, 2022, 141
  • [2] [Anonymous], 2020, IRJET J, V7, P5365
  • [3] Banihashemi S., 2011, ICCPM 2011, V15, P79
  • [4] BIM-Enabled Structural Design: Impacts and Future Developments in Structural Modelling, Analysis and Optimisation Processes
    Chi, Hung-Lin
    Wang, Xiangyu
    Jiao, Yi
    [J]. ARCHIVES OF COMPUTATIONAL METHODS IN ENGINEERING, 2015, 22 (01) : 135 - 151
  • [5] Choudhry R.M., 2018, CAUSES DISCREPANCIES
  • [6] Edwards G., 2015, VIS ENG, V3, P44
  • [7] Fuzor, 2022, US
  • [8] GmbH E., 2022, ENSC
  • [9] Variations and Change Orders on Construction Projects
    Keane, Patrick
    Sertyesilisik, Begum
    Ross, Andrew David
    [J]. JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2010, 2 (02) : 89 - 96
  • [10] Optimal Combination of External Wall Insulation Thickness and Surface Solar Reflectivity of Non-Residential Buildings in the Korean Peninsula
    Kim, Jung Ho
    Kim, Young Il
    [J]. SUSTAINABILITY, 2021, 13 (06)