A robust possibilistic multi-echelon multi-product multi-period production-inventory-routing problem considering internal operations of cross-docks: Case study of FMCG supply chain

被引:10
作者
Jeshvaghani, Mina Dehghani [1 ]
Amiri, Maghsoud [1 ]
Khalili-Damghani, Kaveh [2 ]
Olfat, Laya [1 ]
机构
[1] Allameh Tabatabai Univ, Fac Management & Accounting, Dept Ind Management, Tehran 1434863111, Iran
[2] Islamic Azad Univ, Dept Ind Engn, South Tehran Branch, Tehran, Iran
关键词
Production-inventory-routing problem; Cross-docking; FMCG supply chain; Robust possibilistic programming; Possibilistic chance-constrained programming; Meta-Heuristics; LEARNING-BASED OPTIMIZATION; REVERSE LOGISTICS; PERISHABLE PRODUCTS; DOOR ASSIGNMENT; ALGORITHM; MODEL; DELIVERY; CONSOLIDATION; INTEGRATION; SEARCH;
D O I
10.1016/j.cie.2023.109206
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Integrated and simultaneous decision-making is essential for the production, reproduction, storage, distribution, and cross-docking, especially in Fast-Moving Consumer Goods (FMCG) supply chains. In this paper, a production -inventory-routing problem (PIRP) is essential. We have addressed the PIRP considering four-echelon multi-product, multiple periods, and the reverse flow of defective products. The PIRP also considers the consolidation of the tasks of cross-docks. Robust possibilistic programming (RPP) and possibilistic chance-constrained pro-gramming (PCCP) model the demand uncertainty. Uncertainty performance metrics evaluate the proposed so-lution approaches. Meta-Heuristics, including Teaching-Learning-based Optimization (TLBO) and Invasive weed optimization (IWO) algorithms, solve the deterministic equivalence of RPP and PCCP. Results demonstrate the benefits of the developed models and the robustness of the solution procedures in a real-life FMCG supply chain.
引用
收藏
页数:23
相关论文
共 57 条
[21]   An integrated production inventory routing problem for multi perishable products with fuzzy demands and time windows [J].
Ghasemkhani, A. ;
Tavakkoli-Moghaddam, R. ;
Shahnejat-Bushehri, S. ;
Momen, S. ;
Tavakkoli-Moghaddam, H. .
IFAC PAPERSONLINE, 2019, 52 (13) :523-528
[22]   A robust optimization approach for the production-inventory-routing problem with simultaneous pickup and delivery [J].
Golsefidi, Atefeh Hemmati ;
Jokar, Mohammad Reza Akbari .
COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 143
[23]   A new bi-objective vehicle routing-scheduling problem with cross-docking: Mathematical model and algorithms [J].
Goodarzi, Asefeh Hasani ;
Tavakkoli-Moghaddam, Reza ;
Amini, Alireza .
COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 149
[24]  
Hartmanis J., 1982, Series of Books in the Mathematical Sciences, V24, P90, DOI DOI 10.1137/1024022
[25]   Four-level closed loop supply chain with remanufacturing [J].
Hasanov, P. ;
Jaber, M. Y. ;
Tahirov, N. .
APPLIED MATHEMATICAL MODELLING, 2019, 66 :141-155
[26]   A note on the lifted Miller-Tucker-Zemlin subtour elimination constraints for the capacitated vehicle routing problem [J].
Kara, I ;
Laporte, G ;
Bektas, T .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 158 (03) :793-795
[27]  
Karimi R., 2015, J IND SYSTEMS ENG, V8, P95
[28]   A stochastic bi-objective simulation-optimization model for cascade disaster location-allocation-distribution problems [J].
Khalili-Damghani, Kaveh ;
Tavana, Madjid ;
Ghasemi, Peiman .
ANNALS OF OPERATIONS RESEARCH, 2022, 309 (01) :103-141
[29]   Cross-docking operations: Current research versus industry practice [J].
Ladier, Anne-Laure ;
Alpan, Gulgun .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2016, 62 :145-162
[30]   Expected value of fuzzy variable and fuzzy expected value models [J].
Liu, BD ;
Liu, YK .
IEEE TRANSACTIONS ON FUZZY SYSTEMS, 2002, 10 (04) :445-450