DEVELOPMENT OF A QUALITY MANAGEMENT SYSTEM FOR PRECAST CONCRETE FACTORIES

被引:2
|
作者
Seo, Wonseok [1 ]
Choi, Byungjoo [1 ]
Shin, Dongyoun [2 ]
Kim, Jinyoung [1 ]
机构
[1] Ajou Univ, Dept Architectural Engn, Suwon, South Korea
[2] Dankook Univ, Dept Architecture, Yongin, South Korea
关键词
quality inspection; inspection report; precast concrete; off-site construction; OSC; automation; OFF-SITE CONSTRUCTION; FRAMEWORK; SEGMENTS; CHINA;
D O I
10.3846/jcem.2023.19228
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The precast concrete (PC) method involves manufacturing reinforced concrete building components in a factory that are then transported to and assembled on a construction site. Compared to conventional methods, PC is widely employed as an advantageous means of creating a sustainable environment and improving construction quality. However, due to time and cost increase, many modern PC factories inspect only randomly selected component samples, for which they write inspection reports using paper-based forms. The storage and management of these documents associated with inspections within factories are essential because any defects that occur during the manufacturing process adversely affect the subsequent delivery and assembly activities. In this study, a mobile application capable of automated documentation and the storage, and input of systematic data was developed to generate a system for comprehensive quality management and assurance within PC factories. The developed system was tested in a PC factory, achieving a 47% time-saving rate compared to the conventional inspection method. Inspection reports of the developed system contain considerably more information than those of the conventional method and fundamentally prevent the risk of document damage and loss as they are automatically archived on a server in digital format.
引用
收藏
页码:475 / 486
页数:12
相关论文
共 50 条
  • [21] Investigation of a Precast Concrete Structure System
    Cai Jianguo
    Feng Jian
    Wang Zan
    Chen Yao
    Liu Yafei
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL III, 2008, : 449 - +
  • [22] DEVELOPING AN INTEGRATED BIDDING MANAGEMENT EXPERT-SYSTEM FOR THE PRECAST CONCRETE INDUSTRY
    DAWOOD, NN
    BUILDING RESEARCH AND INFORMATION, 1994, 22 (02): : 95 - 102
  • [23] ON-SITE MANAGEMENT OF PRECAST CONCRETE CONSTRUCTION
    FONDISTOUYANNAS, S
    JOST, DA
    JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1976, 21 (04): : 58 - 71
  • [24] Design, Development, and Application of Precast and Prestressed Concrete System for Rigid Pavement in Indonesia
    Nurjaman, Hari
    Faizal, Lutfi
    Suaryana, Nyoman
    Hariandja, Binsar
    Gambiro
    Purnomo
    Wicaksono, Siswo
    3RD INTERNATIONAL CONFERENCE ON CONSTRUCTION AND BUILDING ENGINEERING (ICONBUILD 2017), 2017, 1903
  • [25] DEVELOPMENT OF THE CONCRETE TECHNOLOGY FOR A PRECAST PRESTRESSED CONCRETE SEGMENTAL BRIDGE
    PFEIFER, DW
    JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1982, 27 (05): : 78 - 99
  • [26] STUDY OF COMMERCIAL DEVELOPMENT IN PRECAST POLYMER CONCRETE
    PRUSINSKI, RC
    JOURNAL OF THE AMERICAN CONCRETE INSTITUTE, 1978, 75 (12): : 711 - 711
  • [27] MAJOR DEVELOPMENT COMPLEX USES PRECAST CONCRETE
    RAJAGOPALAN, KS
    JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1979, 24 (05): : 62 - 68
  • [28] Development of a prestressed and precast concrete segmental lining
    Nishikawa, K
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2003, 18 (2-3) : 243 - 251
  • [29] Knowledge Management Model Applied to a Complex System: Development of Software Factories
    Medina Garcia, Victor Hugo
    Lorena Carrillo, Ticsiana
    Bolanos Castro, Sandro Javier
    7TH INTERNATIONAL CONFERENCE ON KNOWLEDGE MANAGEMENT IN ORGANIZATIONS: SERVICE AND CLOUD COMPUTING, 2013, 172 : 185 - 195