Ultimate behaviour of bolted beam-to-column connections in large rotations

被引:2
|
作者
Francavilla, Antonella B. [1 ]
Latour, Massimo [1 ]
Tan, P. J. [2 ]
Rizzano, Gianvittorio [1 ]
机构
[1] Univ Salerno, Dept Civil Engn, Fisciano, SA, Italy
[2] UCL, Dept Mech Engn, London, England
关键词
T-stubs; Robustness; Geometric non-linear model; Mechanical model; Component method; STUBS; MODEL; CAPACITY; DESIGN; JOINTS; LOAD;
D O I
10.1016/j.jcsr.2023.108006
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The moment-rotation capacity of a beam-to-column joint is critical to the ability of steel-framed structures to survive extreme loading, where catenary actions develop in their connecting beams leading to large joint ro-tations. Recent works have shown that EC3 Part 1-8 breaks down in the regime of large joint rotations since geometric nonlinearity - this is not considered in EC3 -may influence its behaviour leading to gross under-(or over-) prediction of its response. To fill this knowledge gap, a mechanical model of a double-split tee joint (Francavilla et al., 2016), that only considers material non-linearity, is extended here to include geometric non -linearity. The results of six full-scale joint tests, that developed significant catenary actions in the joint com-ponents are presented. The updated mechanical model will be shown to be highly accurate in predicting the ultimate joint rotation (phi) and the maximum bending moment capacity (M) of the joint. Comparison between the predicted parameters and experimental data gives a mean value of 1.04 (and a CoV equal to 0.07) for the ratio phi th/phi exp and a mean and CoV of 1.03 and 0.12, respectively, for the ratio Mth/Mexp. To demonstrate the fidelity of the model, predictions from a previous non-linear material model (MNM), disregarding geometric nonlinearity, will be compared to the current one (GMNM).
引用
收藏
页数:13
相关论文
共 50 条
  • [31] Cyclic behaviour of exterior bamboo scrimber beam-to-column connections
    Kang, Shao-Bo
    Yu, Xiao-Fan
    Xiong, Jun
    Zhou, Shu-Rong
    Long, Bin
    STRUCTURES, 2024, 62
  • [32] Behaviour of beam-to-column minor axis connections - a comprehensive investigation
    Chin, CW
    Sarkar, S
    Virdi, KS
    ADVANCES IN STRUCTURES, VOLS 1 AND 2, 2003, : 101 - 111
  • [33] Behaviour and design of beam-to-column connections under fire conditions
    Ramli-Sulong, N. H.
    Elghazouli, A. Y.
    Izzuddin, B. A.
    FIRE SAFETY JOURNAL, 2007, 42 (6-7) : 437 - 451
  • [34] ULTIMATE STRENGTH OF STIFFENED SYMMETRICAL WELDED STEEL BEAM-TO-COLUMN FLANGE CONNECTIONS
    ELGHAZALY, HA
    SHERBOURNE, AN
    COMPUTERS & STRUCTURES, 1987, 26 (05) : 749 - 760
  • [35] Cyclic behavior of large size flexible beam-to-column connections
    1600, Publ by EERI, Oakland, CA, USA
  • [36] Experimental analysis of innovative dissipative bolted double split tee beam-to-column connections
    Latour, Massimo
    Piluso, Vincenzo
    Rizzano, Gianvittorio
    STEEL CONSTRUCTION-DESIGN AND RESEARCH, 2011, 4 (02): : 53 - 64
  • [37] Response of partially-restrained bolted beam-to-column connections under cyclic loads
    Brunesi, E.
    Nascimbene, R.
    Rassati, G. A.
    JOURNAL OF CONSTRUCTIONAL STEEL RESEARCH, 2014, 97 : 24 - 38
  • [38] Control of bolted beam-to-column connections in moment joints by T-stub properties
    Grecea, D.
    Muntean, N.
    Dubina, D.
    STESSA 2012: PROCEEDINGS OF THE 7TH INTERNATIONAL CONFERENCE ON BEHAVIOUR OF STEEL STRUCTURES IN SEISMIC AREAS, 2012, : 249 - 254
  • [39] Experimental Study and Analysis on Rotational Behavior of Bamboo Scrimber Beam-to-Column Bolted Connections
    Leng, Yubing
    Wang, Zhuolin
    Xu, Ming
    JOURNAL OF STRUCTURAL ENGINEERING, 2021, 147 (09)
  • [40] Rotational Behavior of Bolted Beam-to-Column Connections with Locally Cross-Laminated Glulam
    Wang, Mingqian
    Song, Xiaobin
    Gu, Xianglin
    Zhang, Yunfan
    Luo, Lie
    JOURNAL OF STRUCTURAL ENGINEERING, 2015, 141 (04)