Analysis of delays and cost overruns of road construction projects in the Colombian Caribbean Region

被引:1
|
作者
Canales, Fausto A. [1 ]
Mora, Otto [1 ]
Arrieta-Castro, Marco [1 ]
Moreno-Natera, Anibal [1 ]
del Savio, Alexandre [2 ]
机构
[1] Univ Costa, Dept Civil & Environm, Barranquilla, Atlantico, Colombia
[2] Univ Lima, Civil Engn Dept, Lima, Peru
关键词
geography; planning & development; delays & cost overruns; road construction; construction management; Colombia;
D O I
10.12775/bgss-2023-0025
中图分类号
P9 [自然地理学]; K9 [地理];
学科分类号
0705 ; 070501 ;
摘要
Construction projects are constantly threatened by delays and cost overruns that might compromise their viability. Thus, identifying the leading causes of these issues based on the experience of experienced professionals is essential to planning and reducing these risks. This research evaluates the frequency and severity of variables causing delays and cost overruns in Colombian Caribbean Region road projects. The nine causes studied in this research were defi ned through a literature review, preliminary discussion and a pilot test. A survey directed to 42 road construction engineers allowed the authors to characterise these professionals' perceptions regarding the frequency and severity of these variables in terms of delay and cost overruns, with a confi dence level of 80%. Statistical analyses were applied to the results of the survey to establish which variables generate the most signifi cant impacts when building roads and related works in the Colombian Caribbean Region.
引用
收藏
页码:59 / 70
页数:12
相关论文
共 20 条
  • [1] Estimating Construction Contingency: Accommodating the Potential for Cost Overruns in Road Construction Projects
    Love, Peter E. D.
    Sing, Chun-Pong
    Carey, Brad
    Kim, Jeong Tai
    JOURNAL OF INFRASTRUCTURE SYSTEMS, 2015, 21 (02)
  • [2] Aggregation of factors causing cost overruns and time delays in large public construction projects Trends and implications
    Adam, Abderisak
    Josephson, Per-Erik Bertil
    Lindahl, Goran
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2017, 24 (03) : 393 - 406
  • [3] Causes of time and cost overruns in construction projects: a scoping review
    Gomez-Cabrera, Adriana
    Gutierrez-Bucheli, Laura
    Munoz, Santiago
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (10) : 1107 - 1125
  • [4] Preliminary Cost Estimating for Road Construction Projects
    Mahamid, Ibrahim
    Bruland, Amund
    PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1-3, 2010, : 158 - 161
  • [5] Appropriate delay analysis techniques to analyse delays in road construction projects in Sri Lanka
    Ekanayake, E. M. K.
    Perera, B. A. K. S.
    BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2016, 6 (05) : 521 - 534
  • [6] Root-Cause Analysis of Construction-Cost Overruns
    Rosenfeld, Yehiel
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2014, 140 (01)
  • [7] INTERNALIZATION OF THE COST OF ENVIRONMENTAL IMPACTS IN ROAD CONSTRUCTION PROJECTS
    Protopapas, Angelos L.
    Stamatopoulou, Athanasia
    MANAGEMENT OF TECHNOLOGICAL CHANGES, VOL 1, 2009, : 703 - 706
  • [8] Cost diviation in road construction projects: The case of Palestine
    Mahamid, Ibrahim
    Bruland, Amund
    CONSTRUCTION ECONOMICS AND BUILDING, 2012, 12 (01): : 58 - 71
  • [9] Conceptual Cost Estimate of Road Construction Projects in Saudi Arabia
    Mahamid, Ibrahim
    JORDAN JOURNAL OF CIVIL ENGINEERING, 2013, 7 (03) : 285 - 294
  • [10] Cost Overrun Causes in Road Construction Projects: "Consultants' Perspective"
    Mahamid, Ibrahim
    Bruland, Amund
    CONSTRUCTION AND PROJECT MANAGEMENT, ICCPM 2011, 2011, 15 : 6 - 10