The Optimization of Secondary Lining Construction Time for Shield Tunnels Based on Longitudinal Mechanical Properties

被引:2
作者
Chai, Shaobo [1 ]
Yan, Yifan [1 ]
Hu, Bo [1 ,2 ]
Wang, Hongchao [3 ]
Hu, Jun [1 ,2 ]
Chen, Jian [2 ,4 ]
Fu, Xiaodong [2 ,4 ]
Zhou, Yongqiang [2 ,4 ]
机构
[1] Changan Univ, Sch Civil Engn, Xian 710064, Peoples R China
[2] Chinese Acad Sci, Inst Rock & Soil Mech, State Key Lab Geomech & Geotech Engn, Wuhan 430071, Peoples R China
[3] China Railway Eryuan Engn Grp Co Ltd, Chengdu 610031, Peoples R China
[4] Univ Chinese Acad Sci, Sch Engn Sci, Beijing 100049, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2023年 / 13卷 / 19期
基金
中国国家自然科学基金;
关键词
shield tunnel; double-layered lining; refined numerical model; secondary lining construction time; longitudinal mechanical properties; BEHAVIOR; FAILURE; JOINTS; IMPACT; SOIL;
D O I
10.3390/app131910772
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
In the field of shield tunnels, the occurrence of uneven longitudinal settlement in segment linings has presented persistent challenges, including heightened risks of localized damage and water leakage. While the adoption of a secondary lining has been proposed as a viable solution to these issues, the question of how to select an appropriate construction time for the secondary lining, one that enables it to fully harness its load-bearing capacity while optimizing the tunnel's overall stress and deformation characteristics, continues to be a pressing concern. To address this issue, this study established a three-dimensional longitudinal refined numerical model of double-layer-lined shield tunnel. In addition, the deformation degree of the segment lining was used as a time indicator to define the construction time for the secondary lining. Subsequently, an analysis of the impact of the construction time of the secondary lining on the longitudinal mechanical properties of the double-layer-lined shield tunnel is conducted through an assessment of tunnel longitudinal deformation and structural stress. The research findings indicated that the construction of the secondary lining improved the longitudinal deformation resistance of shield tunnels. Simultaneously, it led to a significant increase in the longitudinal shear forces within the segment lining and a notable reduction in longitudinal bending moments. Moreover, the construction time of the secondary lining played a pivotal role in these alterations. Considering the longitudinal force situations and load-bearing characteristics of the double-layer lining structure, it was determined that the optimal construction time for the secondary lining fell within the range of 20% to 40% of the total construction duration. In this scenario, the deformation and internal forces within the segment lining remained within permissible limits. Additionally, both the segment lining and the secondary lining were able to fully utilize their load-bearing capacities, ensuring the economic and safety aspects of the tunnel.
引用
收藏
页数:25
相关论文
共 46 条
[1]  
Bai Y., 2020, Major Underground Engineering Accidents and Repair Technology at Home and Abroad
[2]  
Chen G.H., 2020, Eur. J. Environ. Civ. Eng, V26, P2950
[3]  
Dai Yi-wei, 2019, Journal of Guangdong University of Technology, V36, P92, DOI 10.12052/gdutxb.180119
[4]   An analytical solution for jointed tunnel linings in elastic soil or rock [J].
El Naggar, Hany ;
Hinchberger, Sean D. .
CANADIAN GEOTECHNICAL JOURNAL, 2008, 45 (11) :1572-1593
[5]   Study on the Mechanical Behavior of Lining Structure for Underwater Shield Tunnel of High-Speed Railway [J].
Feng, Kun ;
He, Chuan ;
Fang, Yong ;
Jiang, Yingchao .
ADVANCES IN STRUCTURAL ENGINEERING, 2013, 16 (08) :1381-1399
[6]   Model test study of the mechanical characteristics of the lining structure for an urban deep drainage shield tunnel [J].
Guo, Rui ;
Zhang, Maoyi ;
Xie, Hongming ;
He, Chuan ;
Fang, Yong ;
Wang, Shimin .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2019, 91
[7]   Deformation Response Induced by Surcharge Loading above Shallow Shield Tunnels in Soft Soil [J].
Huang, Zhen ;
Zhang, Hai ;
Fu, Helin ;
Ma, Shaokun ;
Liu, Ying .
KSCE JOURNAL OF CIVIL ENGINEERING, 2020, 24 (08) :2533-2545
[8]  
Itasca Consulting Group, About us
[9]   Study on Mechanical Characteristics of Segmental Joints of a Large-Diameter Shield Tunnel under Ultrahigh Water Pressure [J].
Kou, Lei ;
Xiong, Zhihui ;
Cui, Hao ;
Zhao, Jinjie .
SENSORS, 2021, 21 (24)
[10]  
[梁敏飞 Liang Minfei], 2019, [岩土工程学报, Chinese Journal of Geotechnical Engineering], V41, P892