共 41 条
[2]
[Anonymous], 2013, BEST AVAILABLE TECHN, DOI [10.2788/12850, DOI 10.2788/12850]
[3]
[Anonymous], 2015, Integrated Carbon Capture and Storage Project at SaskPower's Boundary Dam Power Station
[4]
[Anonymous], 2021, CEMENT
[7]
Evaluating the Carbon Footprint of Cement Plants Integrated With the Calcium Looping CO2 Capture Process
[J].
FRONTIERS IN SUSTAINABILITY,
2022, 3
[8]
CEMCAP, 2017, D3 2 CEMCAP FRAM COM
[10]
Design and Experimental Testing of a 1.9MWth Calcium Looping Pilot Plant
[J].
12TH INTERNATIONAL CONFERENCE ON GREENHOUSE GAS CONTROL TECHNOLOGIES, GHGT-12,
2014, 63
:2100-2108