Cyclic Evaluation of Exterior Beam-to-Column Connections for Intelligent Accelerated Construction of Industrial Facilities

被引:2
作者
Ji, Mingming [1 ,2 ]
Chen, Wei [1 ]
Zeng, Shi [2 ]
Zhao, Xinyu [2 ]
机构
[1] Guangzhou Engn Contractor Grp Co Ltd, Guangzhou 510310, Peoples R China
[2] South China Univ Technol, State Key Lab Subtrop Bldg Sci, Guangzhou 501641, Peoples R China
关键词
precast concrete; rebar anchorage; RC connections; intelligent construction; accelerated construction; seismic performance; SEISMIC PERFORMANCE; PRECAST; JOINTS; DESIGN;
D O I
10.3390/buildings13010062
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The rapid development towards automated construction has been witnessed in recent years mainly due to the growing shortage of skilled labor. Against that backdrop, an accelerated method, with the aid of robotic cranes, is emerging in China to speed up the construction of industrial facilities such as warehouse structures. This method requires that the steel bars in the precast beams do not extend beyond the beam ends to facilitate the temporary fixation of the robotic crane at the top of cast-in-place columns. This, nonetheless, brings a series of new problems, one of which is how to choose a suitable anchoring type for the beam bottom bars. To address this issue, three large-scale exterior beam-to-column connections were fabricated and tested under lateral load reversals. Two anchorage forms, namely, mechanical splices and grouted sleeves, were adopted and compared with the monolithically cast specimen. The test results showed that the specimen using the grouted sleeves had similar seismic performance to that of the cast-in-place specimen, whereas the specimen using the mechanical splices presented significant post-peak deterioration under positive beam bending moments. This happened because the congestion of steel bars within the joint core made it difficult to fully tighten the beam bottom bars into the threaded couplers; consequently, a "slop" was formed which could substantially impair the cyclic behavior of the specimen. As such, it is suggested that grouted sleeves should be more applicable and reliable for the new construction method. This counter-intuitive finding also indicates that, for intelligent construction, no detail should be taken for granted, but rather needs due consideration.
引用
收藏
页数:19
相关论文
共 34 条
[1]  
[Anonymous], 2019, ACI-318
[2]  
[Anonymous], 2016, GB50011-2016.
[3]  
[Anonymous], 2005, ACI Committee 374
[4]  
[Anonymous], 2010, GB500102010
[5]   Seismic Performance of Precast Industrial Facilities Following Major Earthquakes in the Italian Territory [J].
Belleri, A. ;
Brunesi, E. ;
Nascimbene, R. ;
Pagani, M. ;
Riva, P. .
JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2015, 29 (05)
[6]   Horizontal cladding panels: in-plane seismic performance in precast concrete buildings [J].
Belleri, Andrea ;
Torquati, Mauro ;
Marini, Alessandra ;
Riva, Paolo .
BULLETIN OF EARTHQUAKE ENGINEERING, 2016, 14 (04) :1103-1129
[7]  
bft-international, MASTER COMPUTERS 40
[8]   Beam-column joints in continuous RC frames: Comparison between cast-in-situ and precast solutions [J].
Breccolotti, Marco ;
Gentile, Santino ;
Tommasini, Mauro ;
Materazzi, Annibale Luigi ;
Bonfigli, Massimo Federico ;
Pasqualini, Bruno ;
Colone, Valerio ;
Gianesini, Marco .
ENGINEERING STRUCTURES, 2016, 127 :129-144
[9]   Life cycle assessment in the construction sector: A review [J].
Buyle, Matthias ;
Braet, Johan ;
Audenaert, Amaryllis .
RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2013, 26 :379-388
[10]   Seismic retrofitting of existing frame buildings through externally attached sub-structures: State of the art review and future perspectives [J].
Cao, Xu-Yang ;
Shen, Dejian ;
Feng, De-Cheng ;
Wang, Chun-Lin ;
Qu, Zhe ;
Wu, Gang .
JOURNAL OF BUILDING ENGINEERING, 2022, 57