Cost-benefit analysis of construction waste source reduction: a system dynamics approach

被引:13
作者
Tu, Bocun [1 ]
Pan, Min [2 ]
Zuo, Jian [3 ]
Chang, Rui-Dong [3 ]
Webber, Ronald J. [4 ]
Zou, Zhuojing [1 ]
Dong, Na [1 ]
机构
[1] Sichuan Univ, Coll Architecture & Environm, 24 First Sect,South First Ring Rd, Chengdu 610065, Peoples R China
[2] Sichuan Kaiyuan Engn Project Management Consultin, Chengdu 610095, Peoples R China
[3] Univ Adelaide, Sch Architecture & Built Environm, Adelaide, SA 5005, Australia
[4] Cent Queensland Univ, Dept Min Built Environm, Rockhampton, Qld, Australia
关键词
Cost-benefit analysis; Construction waste (CW); Source reduction; System dynamics; ECONOMIC VIABILITY ANALYSIS; CRITICAL SUCCESS FACTORS; DEMOLITION WASTE; ENVIRONMENTAL PERFORMANCE; RECYCLING PLANT; MANAGEMENT; MODEL; MINIMIZATION; DESIGN; DISPOSAL;
D O I
10.1007/s11356-022-22148-z
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Construction waste (CW) source reduction is a crucial strategy to address the sustainability issue of the construction industry. The economic benefit is a key factor affecting project decision-makers on whether to implement this strategy. However, limited studies analysed the cost-benefit of CW source reduction from a system dynamic perspective. Therefore, by considering the design and construction phase as a whole, this study constructed a system dynamics (SD) model based on the identification of the factors affecting the cost-benefit of CW source reduction to analyse the cost-benefit of CW source reduction. A residential building project in China's Chengdu was used for the study case. The results show that the net benefit of CW source reduction is positive, and BIM implementation, design for standard material size, and building material storage are the three strategies to effectively improve the economic benefits of CW source reduction. Furthermore, the best investment level of CW source reduction was also determined. This study provides a model which can be used to simulate the cost-benefit under different implementation levels of reduction strategies and different investment levels in advance, thereby providing a reference for project decision-makers to plan CW source reduction.
引用
收藏
页码:557 / 577
页数:21
相关论文
共 85 条
[1]   Identifying the precursors of vulnerability in agricultural value chains: A system dynamics approach [J].
Aboah, Joshua ;
Wilson, Mark M. J. ;
Bicknell, Kathryn ;
Rich, Karl M. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2021, 59 (03) :683-701
[2]   Critical design factors for minimising waste in construction projects: A structural equation modelling approach [J].
Ajayi, Saheed O. ;
Oyedele, Lukumon O. .
RESOURCES CONSERVATION AND RECYCLING, 2018, 137 :302-313
[3]   Optimising material procurement for construction waste minimization: An exploration of success factors [J].
Ajayi, Saheed O. ;
Oyedele, Lukumon O. ;
Akinade, Olugbenga O. ;
Bilal, Muhammad ;
Alaka, Hafiz A. ;
Owolabi, Hakeem A. .
SUSTAINABLE MATERIALS AND TECHNOLOGIES, 2017, 11 :38-46
[4]   Attributes of design for construction waste minimization: A case study of waste-to-energy project [J].
Ajayi, Saheed O. ;
Oyedele, Lukumon O. ;
Akinade, Olugbenga O. ;
Bilal, Muhammad ;
Alaka, Hafiz A. ;
Owolabi, Hakeem A. ;
Kadiri, Kabir O. .
RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2017, 73 :1333-1341
[5]   Critical management practices influencing on-site waste minimization in construction projects [J].
Ajayi, Saheed O. ;
Oyedele, Lukumon O. ;
Bilal, Muhammad ;
Akinade, Olugbenga O. ;
Alaka, Hafiz A. ;
Owolabi, Hakeem A. .
WASTE MANAGEMENT, 2017, 59 :330-339
[6]   Waste effectiveness of the construction industry: Understanding the impediments and requisites for improvements [J].
Ajayi, Saheed O. ;
Oyedele, Lukumon O. ;
Bilal, Muhammad ;
Akinade, Olugbenga O. ;
Alaka, Haft A. ;
Owolabi, Hakeem A. ;
Kadiri, Kabir O. .
RESOURCES CONSERVATION AND RECYCLING, 2015, 102 :101-112
[7]   Critical success factors for implementing building information modelling (BIM): A longitudinal review [J].
Antwi-Afari, M. F. ;
Li, H. ;
Parn, E. A. ;
Ewards, D. J. .
AUTOMATION IN CONSTRUCTION, 2018, 91 :100-110
[8]   Exploring the critical waste factors affecting construction projects [J].
Bajjou, Mohamed Saad ;
Chafi, Anas .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2022, 29 (06) :2268-2299
[9]   Designing out waste in high-rise residential buildings: Analysis of precasting methods and traditional construction [J].
Baldwin, Andrew ;
Poon, Chi-Sun ;
Shen, Li-Yin ;
Austin, Simon ;
Wong, Irene .
RENEWABLE ENERGY, 2009, 34 (09) :2067-2073
[10]   Implementation of waste management and minimisation in the construction industry of Malaysia [J].
Begum, Rawshan Ara ;
Siwar, Chamhuri ;
Pereira, Joy Jacqueline ;
Jaafar, Abdul Hamid .
RESOURCES CONSERVATION AND RECYCLING, 2007, 51 (01) :190-202