RISK MANAGEMENT IN THE AGILE APPROACH AND PROJECT SUCCESS

被引:0
作者
Fernandes, Pedro Jose Martins Alvarez [1 ]
Rabechini Jr, Roque [2 ]
机构
[1] Univ Nove Julho UNINOVE, Sao Paulo, Brazil
[2] Univ Sao Paulo FEA USP, Fac Econ Admi & Contabilidade, Sao Paulo, Brazil
来源
REVISTA GESTAO & TECNOLOGIA-JOURNAL OF MANAGEMENT AND TECHNOLOGY | 2023年 / 23卷 / 01期
关键词
Risk management; agile; project management; project success; project typology; SOFTWARE-DEVELOPMENT;
D O I
暂无
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Objective: This study aims the investigation of the relationship between risk management and the success of projects managed by agile approaches, supporting the analysis of gaps identified in the literature, regarding the incipient risk management of projects managed by agile approaches, as well as the existence of few studies involving these constructs.Methodology: The methodological approach used in this study was quantitative and the validation through an online survey-type questionary, with the application of structural equation modeling. Originality: Risk management and agile approaches have influenced positively the result of the projects, increasing the interest of the most stakeholders in the field of project management. However, the relationship between these constructs has not been deeply explored in the literature specialized in project management.Main results: The statistical tests results confirmed the influence of risk management in the success of projects managed by agile approaches, as well as confirmed that from a certain level of complexity, projects require a more robust and effective risk management activities.Theoretical contributions: In addition to practical contributions to organizations, the results of this study provided new possibilities for studies in the social sciences field, as well as strengthening the relationship between risk management and project success.
引用
收藏
页码:138 / 162
页数:25
相关论文
共 44 条
  • [1] Alharbi Eman Talal, 2014, International Journal of Computer Network and Information Security, V6, P20, DOI 10.5815/ijcnis.2014.11.03
  • [2] [Anonymous], 2018, INT J ADV COMPUT SC, DOI DOI 10.14569/IJACSA.2018.090461
  • [3] [Anonymous], 2002, 80030 SP NAT I STAND
  • [4] SMARTPLS 3: SPECIFICATION, ESTIMATION, EVALUATION AND REPORTING
    Bido, Diogenes de Souza
    da Silva, Dirceu
    [J]. ADMINISTRACAO-ENSINO E PESQUISA, 2019, 20 (02): : 488 - 536
  • [5] Requirements that handle IKIWISI, COTs, and rapid change
    Boehm, B
    [J]. COMPUTER, 2000, 33 (07) : 99 - 102
  • [6] Get ready for agile methods, with care
    Boehm, B
    [J]. COMPUTER, 2002, 35 (01) : 64 - +
  • [7] Using Velocity, Acceleration, and Jerk to Manage Agile Schedule Risk
    Bumbary, Karen M.
    [J]. 2016 INTERNATIONAL CONFERENCE ON INFORMATION SYSTEMS ENGINEERING (ICISE), 2016, : 73 - 80
  • [8] Carvalho Marly Monteiro, 2009, INOVACAO ESTRATEGIAS
  • [9] A survey study of critical success factors in agile software projects
    Chow, Tsun
    Cao, Dac-Buu
    [J]. JOURNAL OF SYSTEMS AND SOFTWARE, 2008, 81 (06) : 961 - 971
  • [10] Crawford L., 2006, Project Management Journal, V37, P38, DOI [10.1177/875697280603700205, DOI 10.1177/875697280603700205]