Effects of Creep on Shield Tunnelling Through Squeezing Ground

被引:8
作者
Leone, Thomas [1 ]
Nordas, Alexandros N. [1 ]
Anagnostou, Georgios [1 ]
机构
[1] Swiss Fed Inst Technol, Zurich, Switzerland
关键词
Tunnel boring machine; Creep; Perzyna; Shield jamming; Lining overstressing; Standstill; BEHAVIOR; EXCAVATION; MODEL; ROCK;
D O I
10.1007/s00603-023-03505-x
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
The present work aims to improve the reliability of shield jamming and lining damage risk assessment in squeezing ground by analysing the effects of creep on the evolution of rock pressure over time. The study is based on numerical simulations of typical mechanised tunnelling processes, generally consisting of shield advance phases alternating with shorter or longer standstills for lining installation, maintenance, etc. A linear elastic-viscous plastic constitutive model based upon Perzyna's overstress theory is employed, which considers the time-dependency of plastic deformations via a single viscosity parameter. The investigations demonstrate the following: (i) shield loading during advance increases with increasing viscosity under certain conditions, which contradicts the common perception in many existing works that creep is thoroughly favourable for shield jamming; (ii) creep is thoroughly unfavourable for shield loading during long standstills and long-term lining loading, due to the additional viscoplastic ground deformations manifested over time; (iii) the commonly adopted simplifying assumption of continuous excavation with the gross advance rate is adequate only where standstills are very short (e.g., for lining erection during the stop-and-go shield tunnelling process), but otherwise underestimates the shield loading, even in cases of regular inspection and maintenance standstills lasting only a few hours. Two application examples, the Frejus safety gallery and the Gotthard Base tunnel, demonstrate the need to consider creep and the accuracy of modelling tunnel construction by a semi-discrete approach, where only the very short standstills for lining erection are considered via an average advance rate, but longer standstills are explicitly simulated. Assessment of the effect of creep on TBM shield loading.Assessment of the effect of creep on long-term lining loading.Analysis of a counter-intuitive, adverse effect of advance rate on shield loading.Discussion of alternative methods of considering excavation standstills.Development of a semi-discrete model for estimating shield loading during standstills.
引用
收藏
页码:351 / 374
页数:24
相关论文
共 55 条
  • [1] SIGNIFICANT PARAMETERS IN ELASTOPLASTIC ANALYSIS OF UNDERGROUND OPENINGS
    ANAGNOSTOU, G
    KOVARI, K
    [J]. JOURNAL OF GEOTECHNICAL ENGINEERING-ASCE, 1993, 119 (03): : 401 - 419
  • [2] Anagnostou G, 2008, AlpTransit Gotthard Basistunnel, Teilabschnitt Sedrun, Felsmechanische Laborversuche Los 378, Schlussbericht, Bericht Nr. 080109
  • [3] Anagnostou G, 2007, RAP EXC TUNN C TOR, P255
  • [4] [Anonymous], 2019, FLAC, Fast Lagrangian Analysis of Continua, VFirst
  • [5] Physical model simulation of rock-support interaction for the tunnel in squeezing ground
    Arora, Ketan
    Gutierrez, Marte
    Hedayat, Ahmadreza
    [J]. JOURNAL OF ROCK MECHANICS AND GEOTECHNICAL ENGINEERING, 2022, 14 (01) : 82 - 92
  • [6] New Physical Model to Study Tunnels in Squeezing Clay-Rich Rocks
    Arora, Ketan
    Gutierrez, Marte
    Hedayat, Ahmadreza
    [J]. GEOTECHNICAL TESTING JOURNAL, 2021, 44 (04): : 1055 - 1078
  • [7] Time-Dependent Behavior of the Tunnels in Squeezing Ground: An Experimental Study
    Arora, Ketan
    Gutierrez, Marte
    Hedayat, Ahmadreza
    Cruz, Erick Christian
    [J]. ROCK MECHANICS AND ROCK ENGINEERING, 2021, 54 (04) : 1755 - 1777
  • [8] Guidelines for TBM tunnelling in squeezing conditions - a case study
    Barla, G.
    Barla, M.
    Bonini, M.
    Debernardi, D.
    [J]. GEOTECHNIQUE LETTERS, 2014, 4 : 83 - 87
  • [9] Barla G., 2008, 12 INT C INT ASS COM
  • [10] Barla G, 2018, GALLERIE GD OPER SOT, P67