Assessment of risks affecting the operational activities of the Amman bus rapid transit (BRT) system

被引:3
作者
Alnsour, Moawiah A. [1 ]
机构
[1] Isra Univ, Fac Engn, Dept Civil Engn, Amman 11622, Jordan
关键词
Amman; Jordan; Risk assessment; Bus Rapid Transit; Operating activities; CONSTRUCTION PROJECTS; WORK STRESS; INFRASTRUCTURE PROJECTS; PROFESSIONAL DRIVERS; MANAGEMENT; SUSTAINABILITY; EFFICIENCY; ACCIDENTS; RANKING; FATIGUE;
D O I
10.1016/j.aej.2023.07.036
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In the first decade of the 21st century, bus rapid transit (BRT) became a significant transportation method. However, implementing a BRT system in developing countries involves many risks associated with its opera-tional activities, whether political, technical, occupational, or financial. Therefore, a corresponding risk assessment is required, which consists in identifying, classifying, and analysing all risks in any project at each phase of project development. Most studies show that risk evaluations in the early stages refer to planning and implementation. However, little research has been conducted on the operation phase to determine the impor-tance of studying risks at this phase. The current study aims to analyse risks affecting the main operating ac-tivities of Amman BRT system in Jordan. Thus, the risks associated with the Amman BRT project are highlighted by reviewing previous studies, resulting in 45 risk factors classified into five main groups of Amman BRT operational activities, including 17 categories. A survey was carried out by distributing a questionnaire to 177 respondents; 122 were returned, and 115 were accepted for analysis. The collected data were analysed using Statistical Package for the Social Sciences (SPSS) software. Through analysing the questionnaire, the probability of occurrence and the risk impacts were calculated, yielding the relative importance index for each risk. To validate the analysed risks, external validation was carried out by interviewing seven experts in Amman BRT system operation. The key results obtained indicated eight significant risks affecting the Amman BRT system that need to be considered: fuel price change; work-related stress conditions; violence and harassment at work; ac-cidents in the workplace due to breaking traffic rules; a lack of supporting infrastructure (rainwater drainage, a lack of emergency exits on the bus route); corruption and bribery; the involvement of too many multi-level decision-makers; and contract problems between the operator company and the government, where their relative importance indexes ranging from 20.7 to 15.2. The study contributes to the knowledge of this region of the world on this subject. Specifically, the case of BRTs is rare, and knowing which risks are affecting the main operational activities is critical. For future studies, mitigating these risk factors associated with the Amman BRT system is recommended via proper management.
引用
收藏
页码:265 / 280
页数:16
相关论文
共 105 条
[1]   The Manchester Driver Behaviour Questionnaire as a predictor of road traffic accidents [J].
Af Wahlberg, A. ;
Dorn, L. ;
Kline, T. .
THEORETICAL ISSUES IN ERGONOMICS SCIENCE, 2011, 12 (01) :66-86
[2]   Risk assessment framework of PPP-megaprojects focusing on risk interaction and project success [J].
Ahmadabadi, Ali Akbari ;
Heravi, Gholamreza .
TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE, 2019, 124 :169-188
[3]   Construction delays and their causative factors in Nigeria [J].
Aibinu, Ajibade Ayodeji ;
Odeyinka, Henry Agboola .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (07) :667-677
[4]   Psychosocial Factors of Public Transport Users and Social Inclusion Implications among Older Women in Pakistan [J].
Al-Rashid, Muhammad Ahmad ;
Harumain, Yong Adilah Shamsul ;
Goh, Hong Ching ;
Ahmed, Zeshan .
JOURNAL OF URBAN PLANNING AND DEVELOPMENT, 2021, 147 (04)
[5]  
Al-Shibly H.H., 2013, Interdisciplinary journal of contemporary research in business, V5, P12
[6]  
Alnsour M.A., 2019, J ENG RES APPL, V9, P58
[7]  
Arnold L., 2001, TRANSPORTATION RES F, V4, P1, DOI [DOI 10.1016/S1369-8478(01)00010-9, 10.1016/S1369-8478(01)00010-9, 10.1016/s1369-8478(01)00010-9]
[8]   Ranking of delay factors in construction projects after Egyptian revolution [J].
Aziz, Remon Fayek .
ALEXANDRIA ENGINEERING JOURNAL, 2013, 52 (03) :387-406
[9]   Identifying the risk factors affecting the overall cost risk in residential projects at the early stage [J].
Badawy, Mohamed ;
Alqahtani, Fahad ;
Hafez, Hisham .
AIN SHAMS ENGINEERING JOURNAL, 2022, 13 (02)
[10]  
Barber R. B., 2005, International Journal of Project Management, V23, P584, DOI 10.1016/j.ijproman.2005.05.006