Research on the Restrictive Factors of Vigorous Promotion of Prefabricated Buildings in Yancheng under the Background of "Double Carbon"

被引:11
作者
Sun, Houchao [1 ]
Fang, Yuwei [2 ]
Yin, Minggan [1 ]
Shi, Feiting [1 ]
机构
[1] Yancheng Inst Technol, Sch Civil Engn, Yancheng 224051, Peoples R China
[2] Yancheng Housing & Urban Rural Dev Bur, Qual Supervis Stn, Yancheng 224008, Peoples R China
关键词
double carbon; prefabricated building; restrictive factors; DEMATEL; ISM; CONSTRUCTION; CHINA;
D O I
10.3390/su15021737
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In the field of construction, the promotion of prefabricated buildings has been strongly supported by the state due to its low-carbon, environmental protection and high-efficiency characteristics. The process of design, prefabrication, and installation, is restricted by factors such as unsound policy standards, insufficient technological innovation, lack of professional talents, and high costs, which have led to the slow development of prefabricated buildings in China. The main factors that restrict the development of prefabricated buildings in Yancheng are identified from the researcher's point of view by literature review and questionnaire survey method. The degree of centrality and cause of each constraint has been analyzed by the decision-making laboratory method (DEMATEL), and the interpretation structure method (ISM) was used to build a multi-level hierarchical structure model of constraints, the logical relationship, hierarchical relationship and relative importance of each constraint are clarified. It is concluded that industry policies, imperfect standards and insufficient government publicity are the fundamental reasons to hinder the development of prefabricated buildings in Yancheng. According to the order of the centrality, the main restrictive factors are determined, which benefits the establishment of the homologous counterplan for the vigorous promotion of prefabricated buildings in Yancheng.
引用
收藏
页数:21
相关论文
共 27 条
[1]   DfMA for a Better Industrialised Building System [J].
Abd Razak, Mohammed Izrai ;
Khoiry, Muhamad Azry ;
Badaruzzaman, Wan Hamidon Wan ;
Hussain, Afifuddin Husairi .
BUILDINGS, 2022, 12 (06)
[2]  
Bian J., 2021, CONSTR E CONJ, V42, P76
[3]  
Chen W., 2021, JCONSTR EC, V42, P77
[4]  
Chen Y., 2018, Journal of Civil Engineering and Management, V35, P155, DOI [10.13579/j.cnki.2095-0985.2018.02.024, DOI 10.13579/J.CNKI.2095-0985.2018.02.024]
[5]   A novel floor-isolated re-centering system for prefabricated modular mass timber construction - Concept development and preliminary evaluation [J].
Chen, Zhiyong ;
Popovski, Marjan ;
Ni, Chun .
ENGINEERING STRUCTURES, 2020, 222
[6]  
Department of Housing and Urban Rural Development of Guangdong Province of the People's Republic of China Letter of the General Office of the Ministry of Housing and Urban-Rural Development on the Identification of the First Batch of Prefabricated Building Demonstration Cities and Industrial Bases, 2017, COMMUNICATION 1206
[7]  
Gu Q., 2020, THESIS GUANGZHOU U G
[8]   Barriers to promoting prefabricated construction in China: A cost-benefit analysis [J].
Hong, Jingke ;
Shen, Geoffrey Qiping ;
Li, Zhengdao ;
Zhang, Boyu ;
Zhang, Wanqiu .
JOURNAL OF CLEANER PRODUCTION, 2018, 172 :649-660
[9]  
Li D., 2019, CONSTR E CONJ, V40, P87
[10]  
Lu R., 2021, BUILD STRUCT J, V51, P1134