Application of selection hyper-heuristics to the simultaneous optimisation of turbines and cabling within an offshore windfarm

被引:2
|
作者
Butterwick, Thomas [1 ]
Kheiri, Ahmed [1 ]
Lulli, Guglielmo [1 ]
Gromicho, Joaquim [2 ,4 ]
Kreeft, Jasper [3 ]
机构
[1] Univ Lancaster, Dept Management Sci, Lancaster LA1 4YX, England
[2] ORTEC, Houtsingel 5, NL-2719 EA Zoetermeer, Netherlands
[3] Shell Global Solut Int BV, Carel Bylandtlaan 30, NL-2596 HR The Hague, Netherlands
[4] Univ Amsterdam, Amsterdam Business Sch, Plantage Muidergracht 12, NL-1018 TV Amsterdam, Netherlands
关键词
Windfarm; Optimisation; Metaheuristics; Hyper-heuristic; LAYOUT; FARM;
D O I
10.1016/j.renene.2023.03.075
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Global warming has focused attention on how the world produces the energy required to power the planet. It has driven a major need to move away from using fossil fuels for energy production toward cleaner and more sustainable methods of producing renewable energy. The development of offshore windfarms, which harness the power of the wind, is seen as a viable approach to creating renewable energy but they can be difficult to design efficiently. The complexity of their design can benefit significantly from the use of computational optimisation. The windfarm optimisation problem typically consists of two smaller optimisation problems: turbine placement and cable routing, which are generally solved separately. This paper aims to utilise selection hyper-heuristics to optimise both turbine placement and cable routing simultaneously within one optimisation problem. This paper identifies and confirms the feasibility of using selection hyper-heuristics within windfarm optimisation to consider both cabling and turbine positioning within the same single optimisation problem. Key results could not identify a conclusive advantage to combining this into one optimisation problem as opposed to considering both as two sequential optimisation problems.
引用
收藏
页码:1 / 16
页数:16
相关论文
共 24 条
  • [21] Selection hyper-heuristics and job shop scheduling problems: How does instance size influence performance?
    Garza-Santisteban, Fernando
    Cruz-Duarte, Jorge Mario
    Amaya, Ivan
    Ortiz-Bayliss, Jose Carlos
    Conant-Pablos, Santiago Enrique
    Terashima-Marin, Hugo
    JOURNAL OF SCHEDULING, 2024, : 85 - 99
  • [22] Analysing hyper-heuristics based on Neural Networks for the automatic design of population-based metaheuristics in continuous optimisation problems
    Tapia-Avitia, Jose M.
    Cruz-Duarte, Jorge M.
    Amaya, Ivan
    Ortiz-Bayliss, Jose Carlos
    Terashima-Marin, Hugo
    Pillay, Nelishia
    SWARM AND EVOLUTIONARY COMPUTATION, 2024, 89
  • [23] Constructing selection hyper-heuristics for open vehicle routing with time delay neural networks using multiple experts
    Tyasnurita, Raras
    Ozcan, Ender
    Drake, John H.
    Asta, Shahriar
    KNOWLEDGE-BASED SYSTEMS, 2024, 295