The mechanism of large-scale river valley deformation induced by impoundment at the Baihetan Hydropower Station

被引:3
|
作者
Rong, Guan [1 ,2 ]
Xu, Lida [1 ,2 ]
Yu, Song [1 ,2 ]
Chen, Wenfu [3 ]
机构
[1] Wuhan Univ, State Key Lab Water Resources Engn & Management, Wuhan 430072, Peoples R China
[2] Wuhan Univ, Key Lab Rock Mech Hydraul Struct Engn, Minist Educ, Wuhan 430072, Peoples R China
[3] China Three Gorges Corp, Wuhan 430010, Peoples R China
基金
中国国家自然科学基金;
关键词
Baihetan hydropower station; Valley deformation; Deformation mechanism; Impoundment; Numerical simulation; Effective stress principle; LEFT-BANK SLOPE; VARIATIONAL INEQUALITY FORMULATION; SEEPAGE PROBLEMS; HYDRAULIC CONDUCTIVITY; FRACTURED ROCKS; DAM FOUNDATION; RESERVOIR; STABILITY; DESIGN; TESTS;
D O I
10.1016/j.compgeo.2023.105898
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Impoundment-induced valley contraction impacts arch dam safety. Baihetan is the second-largest hydropower plant, and there is an urgent need to study its valley deformation mechanism for arch dam safety assessment. The scope of previous studies on engineering cases was mostly limited to the near-dam area, but the large-scale deformation trend has rarely been reported. In addition, the groundwater level change during cofferdam operation has rarely been emphasized in valley deformation analysis. In this paper, a numerical model describing the complex seepage field at the dam site was developed. Furthermore, numerical simulations were performed for characterizing the large-scale valley deformation trend. In addition, monitoring data were collected to validate the simulation method. The large-scale monitoring results showed that the valley near the dam contracted while the valley away from the dam widened. The spatial variability of valley contraction is related to bypass seepage and substantial artificial slope shaping. The main reasons for valley contraction are effective stress reduction and the steep topography excavated for hydraulic building arrangement. In addition, the significant decrease in the groundwater level during cofferdam operation exacerbated valley contraction after impoundment.
引用
收藏
页数:13
相关论文
共 50 条
  • [1] Analysis of reservoir slope deformation during initial impoundment at the Baihetan Hydropower Station, China
    Xu, Lida
    Rong, Guan
    Qiu, Qinyan
    Zhang, Huqi
    Chen, Wenfu
    Chen, Zhiheng
    ENGINEERING GEOLOGY, 2023, 323
  • [3] Deformation response and mechanical analysis of the Wangjiashan landslide in Baihetan Hydropower Station, China, during initial impoundment
    Xiaoting, Chen
    Renjiang, Li
    Bin, Hu
    Yueping, Yin
    Jianyuan, Yang
    Shu, Jiang
    Panpan, Qin
    Bolin, Huang
    BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2023, 82 (09)
  • [4] Deformation response and mechanical analysis of the Wangjiashan landslide in Baihetan Hydropower Station, China, during initial impoundment
    Chen Xiaoting
    Li Renjiang
    Hu Bin
    Yin Yueping
    Yang Jianyuan
    Jiang Shu
    Qin Panpan
    Huang Bolin
    Bulletin of Engineering Geology and the Environment, 2023, 82
  • [5] Large Deformation Prediction and Feedback for A Reservoir Slope near A Large-scale Hydropower Station in the Upstream of Yellow River
    Peng, Jing
    Fu, Wenxi
    ADVANCES IN CIVIL ENGINEERING, PTS 1-4, 2011, 90-93 : 1684 - 1690
  • [6] Simulating changes of gravity and Coulomb stress caused by the impoundment of the Baihetan hydropower station
    She YaWen
    Fu GuangYu
    Zhao Qian
    Guo LingDong
    CHINESE JOURNAL OF GEOPHYSICS-CHINESE EDITION, 2021, 64 (06): : 1925 - 1936
  • [7] Engineering geological study on a large-scale toppling deformation at Xiaowan Hydropower Station
    Huang, Runqiu
    Yang, Genlan
    Yan, Ming
    Liu, Ming
    LANDSLIDES AND ENGINEERED SLOPES: FROM THE PAST TO THE FUTURE, VOLS 1 AND 2, 2008, : 389 - +
  • [8] Deformation behavior and triggering mechanism of the Tuandigou landslide around the reservoir area of Baihetan hydropower station
    Cheng, Zhichao
    Liu, Shiqi
    Fan, Xuewen
    Shi, Anchi
    Yin, Kexin
    LANDSLIDES, 2023, 20 (08) : 1679 - 1689
  • [9] Mechanism of deep deformation of roof arch of underground powerhouse at right bank of Baihetan Hydropower Station
    Meng G.-T.
    He S.-H.
    Chen J.-L.
    Wu J.-Y.
    Chen P.-Z.
    Duan X.-P.
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2020, 42 (03): : 576 - 583
  • [10] Deformation behavior and triggering mechanism of the Tuandigou landslide around the reservoir area of Baihetan hydropower station
    Zhichao Cheng
    Shiqi Liu
    Xuewen Fan
    Anchi Shi
    Kexin Yin
    Landslides, 2023, 20 : 1679 - 1689