Bi-Objective Modeling and Optimization for Stochastic Two-Stage Open Shop Scheduling Problems in the Sharing Economy

被引:29
|
作者
Fu, Yaping [1 ,2 ]
Li, Haobin [3 ]
Huang, Min [4 ]
Xiao, Hui [5 ]
机构
[1] Qingdao Univ, Sch Business, Qingdao 266071, Peoples R China
[2] Natl Univ Singapore, Dept Ind & Syst Engn, Singapore 117578, Singapore
[3] Natl Univ Singapore, Dept Ind Syst Engn & Management, Singapore 117578, Singapore
[4] Northeastern Univ, Coll Informat Sci & Engn, State Key Lab Synthet Automat Proc Ind, Shenyang 110819, Peoples R China
[5] Southwestern Univ Finance & Econ, Sch Stat, Chengdu 611130, Peoples R China
基金
中国博士后科学基金; 中国国家自然科学基金;
关键词
Optimization; Job shop scheduling; Maintenance engineering; Task analysis; Stochastic processes; Companies; Indexes; Discrete event system; migrating birds optimization (MBO); multiobjective optimization; sharing economy; two-stage open shop scheduling; MIGRATING BIRDS OPTIMIZATION; DEPENDENT SETUP TIMES; FLOW-SHOP; MULTIOBJECTIVE OPTIMIZATION; GENETIC ALGORITHM; PROGRAMMING-MODEL; MAINTENANCE; TECHNOLOGY; ASSIGNMENT; ALLOCATION;
D O I
10.1109/TEM.2021.3095954
中图分类号
F [经济];
学科分类号
02 ;
摘要
Nowadays, many manufacturing and service industries prefer to share resources such as facilities and workers to cooperatively perform tasks, which can efficiently improve resource utilization and customer satisfaction. Generally, the decision-makers need to pay more for resource usage, leading to an urgent demand to decrease operational costs. This article proposes a stochastic bi-objective two-stage open shop scheduling problem that models a vehicle maintenance process where tasks are appointed to be completed by multiple third-party companies with professional equipment. We formulate this optimization problem by minimizing the total tardiness and processing cost subject to various resource constraints. A hybrid multiobjective migrating birds optimization combined with a genetic operation and a discrete event system is designed by considering problem characteristics to solve the problem. In this method, the migrating birds optimization with some particular strategies aims at searching candidate solutions from the entire solution domain. Simultaneously, the discrete event system, by using stochastic simulation and discrete event-based simulation approaches, focuses on evaluating the performance of searched solutions. Simulation experiments are performed, and state-of-the-art algorithms are used as competitive approaches. The results confirm that this approach has an excellent performance in handling our considered problem.
引用
收藏
页码:3395 / 3409
页数:15
相关论文
共 50 条
  • [41] Combinatorial optimization of stochastic multi-objective problems: An application to the flow-shop scheduling problem
    Liefooghe, Arnaud
    Basseur, Matthieu
    Jourdan, Laetitia
    Talbi, El-Ghazali
    EVOLUTIONARY MULTI-CRITERION OPTIMIZATION, PROCEEDINGS, 2007, 4403 : 457 - +
  • [42] A bi-objective two-stage robust location model for waste-to-energy facilities under uncertainty
    Hu, Chenlian
    Liu, Xiao
    Lu, Jie
    DECISION SUPPORT SYSTEMS, 2017, 99 : 37 - 50
  • [43] A bi-objective MILP model for an open-shop scheduling problem with reverse flows and sequence-dependent setup times
    Aghighi, Saba
    Mehdizadeh, Esmaeil
    Niaki, Seyed Taghi Akhavan
    Najafi, Amir Abbas
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2024, 18 (03) : 433 - 468
  • [44] Bi-objective optimization of a job shop with two types of failures for the operating machines that use automated guided vehicles
    Karimi, Behzad
    Niaki, S. T. A.
    Haleh, Hassan
    Naderi, Bahman
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2018, 175 : 92 - 104
  • [45] A hybrid two-stage algorithm for solving the blocking flow shop scheduling problem with the objective of minimise the makespan
    Kumar, Harendra
    Giri, Shailendra
    INTERNATIONAL JOURNAL OF APPLIED MANAGEMENT SCIENCE, 2022, 14 (04) : 316 - 335
  • [46] A new two-stage based evolutionary algorithm for solving multi-objective optimization problems
    Wang, Yiming
    Gao, Weifeng
    Gong, Maoguo
    Li, Hong
    Xie, Jin
    INFORMATION SCIENCES, 2022, 611 : 649 - 659
  • [47] Modeling and Optimization of Two-Stage Composite Cure with the Use Open-Mold Tooling
    Wu, Jiing-Kae
    Shevtsov, Sergey N.
    Chang, Shun-Hsyung
    2016 INTERNATIONAL CONFERENCE ON SYSTEM SCIENCE AND ENGINEERING (ICSSE), 2016,
  • [48] Day-Ahead Scheduling of Centralized Energy Storage System by Proposed Stochastic MINLP-Based Bi-Objective Optimization Approach
    Eslahi, Milad
    Nematollahi, Amin Foroughi
    Vahidi, Behrooz
    ELECTRIC POWER COMPONENTS AND SYSTEMS, 2020, 48 (12-13) : 1234 - 1249
  • [49] Uncertain location-allocation decisions for a bi-objective two-stage supply chain network design problem with environmental impacts
    Mahmoodirad, Ali
    Niroomand, Sadegh
    EXPERT SYSTEMS, 2020, 37 (05)
  • [50] Modeling truck scheduling problem at a cross-dock facility through a bi-objective bi-level optimization approach
    Heidari, Fateme
    Zegordi, Seyed Hessameddin
    Tavakkoli-Moghaddam, Reza
    JOURNAL OF INTELLIGENT MANUFACTURING, 2018, 29 (05) : 1155 - 1170