Bi-Objective Modeling and Optimization for Stochastic Two-Stage Open Shop Scheduling Problems in the Sharing Economy

被引:29
|
作者
Fu, Yaping [1 ,2 ]
Li, Haobin [3 ]
Huang, Min [4 ]
Xiao, Hui [5 ]
机构
[1] Qingdao Univ, Sch Business, Qingdao 266071, Peoples R China
[2] Natl Univ Singapore, Dept Ind & Syst Engn, Singapore 117578, Singapore
[3] Natl Univ Singapore, Dept Ind Syst Engn & Management, Singapore 117578, Singapore
[4] Northeastern Univ, Coll Informat Sci & Engn, State Key Lab Synthet Automat Proc Ind, Shenyang 110819, Peoples R China
[5] Southwestern Univ Finance & Econ, Sch Stat, Chengdu 611130, Peoples R China
基金
中国博士后科学基金; 中国国家自然科学基金;
关键词
Optimization; Job shop scheduling; Maintenance engineering; Task analysis; Stochastic processes; Companies; Indexes; Discrete event system; migrating birds optimization (MBO); multiobjective optimization; sharing economy; two-stage open shop scheduling; MIGRATING BIRDS OPTIMIZATION; DEPENDENT SETUP TIMES; FLOW-SHOP; MULTIOBJECTIVE OPTIMIZATION; GENETIC ALGORITHM; PROGRAMMING-MODEL; MAINTENANCE; TECHNOLOGY; ASSIGNMENT; ALLOCATION;
D O I
10.1109/TEM.2021.3095954
中图分类号
F [经济];
学科分类号
02 ;
摘要
Nowadays, many manufacturing and service industries prefer to share resources such as facilities and workers to cooperatively perform tasks, which can efficiently improve resource utilization and customer satisfaction. Generally, the decision-makers need to pay more for resource usage, leading to an urgent demand to decrease operational costs. This article proposes a stochastic bi-objective two-stage open shop scheduling problem that models a vehicle maintenance process where tasks are appointed to be completed by multiple third-party companies with professional equipment. We formulate this optimization problem by minimizing the total tardiness and processing cost subject to various resource constraints. A hybrid multiobjective migrating birds optimization combined with a genetic operation and a discrete event system is designed by considering problem characteristics to solve the problem. In this method, the migrating birds optimization with some particular strategies aims at searching candidate solutions from the entire solution domain. Simultaneously, the discrete event system, by using stochastic simulation and discrete event-based simulation approaches, focuses on evaluating the performance of searched solutions. Simulation experiments are performed, and state-of-the-art algorithms are used as competitive approaches. The results confirm that this approach has an excellent performance in handling our considered problem.
引用
收藏
页码:3395 / 3409
页数:15
相关论文
共 50 条
  • [31] Bi-objective optimization of flexible flow shop scheduling problem with multi-skilled human resources
    Fekri, Masoud
    Heydari, Mehdi
    Mazdeh, Mohammad Mahdavi
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2024, 133
  • [32] Bi-objective dynamic tugboat scheduling with speed optimization under stochastic and time-varying service demands
    Wei, Xiaoyang
    Lau, Hoong Chuin
    Xiao, Zhe
    Fu, Xiuju
    Zhang, Xiaocai
    Qin, Zheng
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2025, 193
  • [33] A smart bi-objective two-stage algorithm for optimal transmission switching without islanding
    Pal, Sananda
    Sen, Sawan
    Bera, Jitendranath
    Sengupta, Samarjit
    SADHANA-ACADEMY PROCEEDINGS IN ENGINEERING SCIENCES, 2020, 45 (01):
  • [34] A smart bi-objective two-stage algorithm for optimal transmission switching without islanding
    Sananda Pal
    Sawan Sen
    Jitendranath Bera
    Samarjit Sengupta
    Sādhanā, 2020, 45
  • [35] Multi-objective capacity optimization of a hybrid energy system in two-stage stochastic programming framework
    Li, Rong
    Yang, Yong
    ENERGY REPORTS, 2021, 7 : 1837 - 1846
  • [36] Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem
    Moradi, E.
    Ghomi, S. M. T. Fatemi
    Zandieh, M.
    EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (06) : 7169 - 7178
  • [37] Bi-Objective, Dynamic, Multiprocessor Open-Shop Scheduling: A Hybrid Scatter Search-Tabu Search Approach
    Abdelmaguid, Tamer F.
    ALGORITHMS, 2024, 17 (08)
  • [38] Robust scheduling based on extreme learning machine for bi-objective flexible job-shop problems with machine breakdowns
    Yang, Yu
    Huang, Min
    Wang, Zhen Yu
    Zhu, Qi Bing
    EXPERT SYSTEMS WITH APPLICATIONS, 2020, 158 (158)
  • [39] A belief degree-based uncertain scheme for a bi-objective two-stage green supply chain network design problem with direct shipment
    Mahmoodirad, Ali
    Niroomand, Sadegh
    SOFT COMPUTING, 2020, 24 (24) : 18499 - 18519
  • [40] A bi-objective possibilistic programming model for open shop scheduling problems with sequence-dependent setup times, fuzzy processing times, and fuzzy due dates
    Noori-Darvish, Samane
    Mahdavi, Iraj
    Mahdavi-Amiri, Nezam
    APPLIED SOFT COMPUTING, 2012, 12 (04) : 1399 - 1416