Bi-Objective Modeling and Optimization for Stochastic Two-Stage Open Shop Scheduling Problems in the Sharing Economy

被引:29
|
作者
Fu, Yaping [1 ,2 ]
Li, Haobin [3 ]
Huang, Min [4 ]
Xiao, Hui [5 ]
机构
[1] Qingdao Univ, Sch Business, Qingdao 266071, Peoples R China
[2] Natl Univ Singapore, Dept Ind & Syst Engn, Singapore 117578, Singapore
[3] Natl Univ Singapore, Dept Ind Syst Engn & Management, Singapore 117578, Singapore
[4] Northeastern Univ, Coll Informat Sci & Engn, State Key Lab Synthet Automat Proc Ind, Shenyang 110819, Peoples R China
[5] Southwestern Univ Finance & Econ, Sch Stat, Chengdu 611130, Peoples R China
基金
中国博士后科学基金; 中国国家自然科学基金;
关键词
Optimization; Job shop scheduling; Maintenance engineering; Task analysis; Stochastic processes; Companies; Indexes; Discrete event system; migrating birds optimization (MBO); multiobjective optimization; sharing economy; two-stage open shop scheduling; MIGRATING BIRDS OPTIMIZATION; DEPENDENT SETUP TIMES; FLOW-SHOP; MULTIOBJECTIVE OPTIMIZATION; GENETIC ALGORITHM; PROGRAMMING-MODEL; MAINTENANCE; TECHNOLOGY; ASSIGNMENT; ALLOCATION;
D O I
10.1109/TEM.2021.3095954
中图分类号
F [经济];
学科分类号
02 ;
摘要
Nowadays, many manufacturing and service industries prefer to share resources such as facilities and workers to cooperatively perform tasks, which can efficiently improve resource utilization and customer satisfaction. Generally, the decision-makers need to pay more for resource usage, leading to an urgent demand to decrease operational costs. This article proposes a stochastic bi-objective two-stage open shop scheduling problem that models a vehicle maintenance process where tasks are appointed to be completed by multiple third-party companies with professional equipment. We formulate this optimization problem by minimizing the total tardiness and processing cost subject to various resource constraints. A hybrid multiobjective migrating birds optimization combined with a genetic operation and a discrete event system is designed by considering problem characteristics to solve the problem. In this method, the migrating birds optimization with some particular strategies aims at searching candidate solutions from the entire solution domain. Simultaneously, the discrete event system, by using stochastic simulation and discrete event-based simulation approaches, focuses on evaluating the performance of searched solutions. Simulation experiments are performed, and state-of-the-art algorithms are used as competitive approaches. The results confirm that this approach has an excellent performance in handling our considered problem.
引用
收藏
页码:3395 / 3409
页数:15
相关论文
共 50 条
  • [21] A Two-Stage Multi-Objective Genetic Algorithm for a Flexible Job Shop Scheduling Problem with Lot Streaming
    Rooyani, Danial
    Defersha, Fantahun
    ALGORITHMS, 2022, 15 (07)
  • [22] Solving and optimizing a bi-objective open shop scheduling problem by a modified genetic algorithm
    Ali Azadeh
    SeyedMorteza Goldansaz
    AmirHossein Zahedi-Anaraki
    The International Journal of Advanced Manufacturing Technology, 2016, 85 : 1603 - 1613
  • [23] Design of a genetic algorithm for bi-objective flow shop scheduling problems with re-entrant jobs
    Carman K. M. Lee
    Danping Lin
    William Ho
    Zhang Wu
    The International Journal of Advanced Manufacturing Technology, 2011, 56 : 1105 - 1113
  • [24] Design of a genetic algorithm for bi-objective flow shop scheduling problems with re-entrant jobs
    Lee, Carman K. M.
    Lin, Danping
    Ho, William
    Wu, Zhang
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 56 (9-12): : 1105 - 1113
  • [25] Bi-objective Optimization of Multiple-route Job Shop Scheduling with Route Cost
    Zheng, Feifeng
    Sui, Yang
    IFAC PAPERSONLINE, 2019, 52 (13): : 881 - 886
  • [26] A Two-Stage Solution to the Bi-Objective Optimal Voltage Regulation Problem
    Kryonidis, Georgios C.
    Demoulias, Charis S.
    Papagiannis, Grigoris K.
    IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2020, 11 (02) : 928 - 937
  • [27] A Two-Stage ε-Constraint Strategy-Based Heuristic for Bi-Objective Quadratic Multiple Knapsack Problems
    Aider, Meziane
    Gacem, Oussama
    Hifi, Mhand
    2020 7TH INTERNATIONAL CONFERENCE ON SOFT COMPUTING & MACHINE INTELLIGENCE (ISCMI 2020), 2020, : 51 - 55
  • [28] Swarm intelligent based metaheuristics for a bi-objective flexible job shop integrated supply chain scheduling problems
    Mahmud, Shahed
    Chakrabortty, Ripon K.
    Abbasi, Alireza
    Ryan, Michael J.
    Applied Soft Computing, 2022, 121
  • [29] Two-Stage Optimization Problems with Multivariate Stochastic Order Constraints
    Dentcheva, Darinka
    Wolfhagen, Eli
    MATHEMATICS OF OPERATIONS RESEARCH, 2016, 41 (01) : 1 - 22
  • [30] The Similarity Index to Decompose Two-Stage Stochastic Scheduling Problems
    Montes, Daniel
    Pitarch, Jose Luis
    de Prada, Cesar
    IFAC PAPERSONLINE, 2022, 55 (07): : 821 - 826