Case Study on Tunnel Settlement Calculations during Construction Considering Shield Disturbance

被引:9
|
作者
Sun, Fuxue [1 ,2 ,3 ]
Jin, Zhouzhou [1 ,2 ,3 ]
Wang, Chaoliang [4 ]
Gou, Changfei [4 ]
Li, Xiaochun [5 ]
Liu, Cheng [6 ]
Yu, Zheng [1 ,2 ,3 ]
机构
[1] Wenzhou Univ, Coll Civil Engn & Architecture, Wenzhou 325035, Peoples R China
[2] Key Lab Engn Technol Soft Soil Fdn & Tideland Recl, Wenzhou 325035, Peoples R China
[3] Disaster Prevent & Mitigat Coastal Soft Soil Fdn, Zhejiang Engn Res Ctr, Wenzhou 325035, Peoples R China
[4] Wenzhou Railway & Rail Transit Investment Grp Co L, Wenzhou 325000, Peoples R China
[5] Shanghai Tunnel Engn Co Ltd, Shanghai 200000, Peoples R China
[6] Nanjing Forestry Univ, Coll Civil Engn, Nanjing 210000, Peoples R China
关键词
Structural soft soil; Slurry shield; Construction period; Disturbance; Tunnel settlement; SOIL DISTURBANCE; SLURRY SHIELD; SOFT; EXCAVATION; MODEL;
D O I
10.1007/s12205-023-0925-z
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Shield construction in structural soft soils inevitably disturbs the soil around the tunnel leading to tunnel settlement instead of tunnel uplift due to soil unloading rebound during construction. In this paper, tunnel settlement prediction in structural soft soils during construction has been studied by adopting Oujiang Beikou shield tunnel as an example. Firstly, disturbance degree calculation method based on effective stress was introduced and the disturbance degree due to shield construction was numerically simulated. Secondly, combined with one-dimensional consolidation test results, a "two-fold line" settlement calculation model was developed for disturbed soil. Finally, tunnel settlement during construction was predicted through one-way compression layer-summation method and compared with experimentally measured results. Research results demonstrated that the developed method was suitable for the prediction of shield tunnel settlement in structural soft soils.
引用
收藏
页码:2202 / 2216
页数:15
相关论文
共 50 条
  • [1] Case Study on Tunnel Settlement Calculations during Construction Considering Shield Disturbance
    Fuxue Sun
    Zhouzhou Jin
    Chaoliang Wang
    Changfei Gou
    Xiaochun Li
    Cheng Liu
    Zheng Yu
    KSCE Journal of Civil Engineering, 2023, 27 : 2202 - 2216
  • [2] Impact of shield tunnel construction disturbance on elastic settlement of tunnel structure
    Wang, Z.-L. (wangzhilaingtj@126.com), 1600, Science Press (36):
  • [3] Numerical analysis of shield tunnel settlement considering construction process
    Yu, De-Hai
    Zhang, Tao
    Jiang, An-Nan
    Journal of Railway Engineering Society, 2015, 32 (07) : 88 - 93
  • [4] Study of Ground Settlement of Tunnel Shield Construction in Loess Area
    Chen Yuchao
    Wang Lu
    2009 INTERNATIONAL CONFERENCE ON ENGINEERING COMPUTATION, 2009, : 25 - +
  • [5] Analysis of Ground Settlement during Shield Tunnel Construction in Soft Soil
    Huang, R.
    Zhu, J. -X
    Zhu, X. -J
    Liu, Z. -M
    SOIL MECHANICS AND FOUNDATION ENGINEERING, 2023, 60 (02) : 134 - 140
  • [6] Additional Stress of Soil and Surface Settlement during Tunnel Shield Construction
    Li, Ying
    Bian, Xiaowei
    Peng, Hao
    Zhu, Baoqiang
    Zhou, Yilin
    BUILDINGS, 2023, 13 (06)
  • [7] Analysis of Ground Settlement during Shield Tunnel Construction in Soft Soil
    R. Huang
    J.-X. Zhu
    X.-J. Zhu
    Z.-M. Liu
    Soil Mechanics and Foundation Engineering, 2023, 60 : 134 - 140
  • [8] Long-term settlement and construction disturbance during shield tunneling in soft ground
    Zhu, Qi-Yin
    Ye, Guan-Lin
    Wang, Jian-Hua
    Xia, Xiao-He
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2010, 32 (SUPPL. 2): : 509 - 512
  • [9] Study on the influence law of underpass construction of new tunnel on the disturbance of existing upper shield tunnel
    Zhang, Haohao
    Lei, Mingfeng
    Liu, Linghui
    Li, Yufeng
    Tang, Qianlong
    Wang, Lichuan
    Journal of Railway Science and Engineering, 2020, 17 (02) : 396 - 404
  • [10] Grope for shield tunnel construction induced ground maximal settlement
    Wei Xin-jiang
    Zhang Jin-ju
    Zhang Shi-min
    ROCK AND SOIL MECHANICS, 2008, 29 (02) : 445 - 448