Study on overlying strata movement patterns and mechanisms in super-large mining height stopes

被引:62
作者
Zhang, Jicheng [1 ]
Li, Xuelong [1 ]
Qin, Qizhi [1 ,2 ]
Wang, Yabo [1 ]
Gao, Xin [1 ]
机构
[1] Shandong Univ Sci & Technol, State Key Lab Min Disaster Prevent & Control, Qingdao 266590, Peoples R China
[2] Yankuang Grp Co LTD, Jining 272100, Peoples R China
基金
中国国家自然科学基金;
关键词
Super-large mining height; Near shallow coal seam; Rock movement; Rock pressure behavior; Periodic weighting; THICK COAL SEAM; FACE; DEFORMATION; BREAKAGE; PRESSURE; FAILURE; SPEED; MODEL; BEAM;
D O I
10.1007/s10064-023-03185-5
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Aiming at the problem of strong mining pressure in the near shallow buried and super-large mining height face, and considering the first 108 working faces in Jinjitan Coal Mine as the engineering background, the movement pattern and pressure distribution characteristics of the overlying rock layer on the 8.2 m fully mechanized mining face were analyzed from the perspective of theoretical analysis, field monitoring data, and numerical simulation. The results of the spatial structure mechanics model and FLAC(3D) numerical model of the mining face with a super-large mining height established in this study, which indicated that the mining operation of the mining face with a super-large mining height experienced rock dynamic load pressure and large-small periodic pressure phenomena. The fracture of the lower keystone beam leads to a small pressure cycle, and a large pressure cycle occurs when both the upper and lower keystone beams are fractured. Generally, the step distance during the size cycle is about twice the normal cycle. The site monitoring data shows that the initial incoming pressure step is 102 m and the periodic incoming pressure step is about 28.7 m, which is consistent with the theoretical value. When the working surface advances slowly, the dynamic load factor is smaller, and the incoming pressure step and duration are shorter, and vice versa. The research results are of important reference significance for mine pressure law and disaster prevention in similar conditions.
引用
收藏
页数:13
相关论文
共 39 条
  • [1] Negative externalities of high-intensity mining and disaster prevention technology in China
    Bai, Erhu
    Guo, Wenbing
    Tan, Yi
    [J]. BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2019, 78 (07) : 5219 - 5235
  • [2] Relative permeability measurement of coal microchannels using advanced microchip technology
    Chen, Shaojie
    Zhang, Jicheng
    Yin, Dawei
    Cheng, Xianzhen
    Jiang, Ning
    [J]. FUEL, 2022, 312
  • [3] A zoning model for coal mining - induced strata movement based on microseismic monitoring
    Cheng, Guanwen
    Ma, Tianhui
    Tang, Chunan
    Liu, Hongyuan
    Wang, Sujian
    [J]. INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2017, 94 : 123 - 138
  • [4] Coal pillar design when considered a reinforcement problem rather than a suspension problem
    Frith, Russell
    Reed, Guy
    [J]. INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2018, 28 (01) : 11 - 19
  • [5] The Study of Key Stratum Location and Characteristics on the Mining of Extremely Thick Coal Seam under Goaf
    Guo, Gaochuan
    Yang, Yongkang
    [J]. ADVANCES IN CIVIL ENGINEERING, 2021, 2021
  • [6] De-Capacity Policy Effect on China's Coal Industry
    Hao, Xuguang
    Song, Mei
    Feng, Yunan
    Zhang, Wen
    [J]. ENERGIES, 2019, 12 (12)
  • [7] He MC., 2007, J MIN SAF ENG, V24, P27
  • [8] Development and formation of ground fissures induced by an ultra large mining height longwall panel in Shendong mining area
    He, Xiang
    Zhao, Yixin
    Yang, Ke
    Zhang, Cun
    Han, Penghua
    [J]. BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2021, 80 (10) : 7879 - 7898
  • [9] Key Stratum Structure and Support Working Resistance of Longwall Face with Large Mining Height in the Shallow Coal Seams, China
    Huang, Qingxiang
    Zhou, Jinlong
    Cao, Jian
    [J]. ADVANCES IN CIVIL ENGINEERING, 2020, 2020
  • [10] Safety Assessment of Antiliquefaction Performance of a Constructed Reservoir Embankment. I: Experimental Assessment
    Huang, Y.
    Zhu, C. Q.
    [J]. JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2017, 31 (02)