A decomposition-based multi-objective evolutionary algorithm for hybrid flowshop rescheduling problem with consistent sublots

被引:31
作者
Zhang, Biao [1 ]
Pan, Quan-ke [2 ]
Meng, Lei-lei [1 ]
Zhang, Xin-li [3 ]
Jiang, Xu-chu [4 ]
机构
[1] Liaocheng Univ, Sch Comp Sci, Liaocheng, Shandong, Peoples R China
[2] Shanghai Univ, Sch Mech Engn & Automat, Shanghai, Peoples R China
[3] Liaocheng Univ, Sch Math Sci, Liaocheng, Shandong, Peoples R China
[4] Zhongnan Univ Econ & Law, Sch Stat & Math, Wuhan 430073, Peoples R China
关键词
Hybrid flowshop rescheduling; lot streaming; consistent sublots; migrating birds optimisation; multi-objective optimisation; MIGRATING BIRDS OPTIMIZATION; SHOP SCHEDULING PROBLEM; OBJECTIVE OPTIMIZATION; GENETIC ALGORITHM; PERFORMANCE; MACHINES; MINIMIZE; MOEA/D; MODEL; TIME;
D O I
10.1080/00207543.2022.2093680
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Lot streaming is the most widely used technique to facilitate the overlap of successive operations. Considering the consistent sublots and machine breakdown, this study investigates the multi-objective hybrid flowshop rescheduling problem with consistent sublots (MOHFRP_CS), which aims at optimising the total completion time, starting time deviations of operations, and average adjustment of sublot sizes simultaneously. By introducing the decomposition strategy and effective migrating birds optimisation framework, this paper develops a multi-objective migrating birds optimisation algorithm based on decomposition (MMBO/D). In MMBO/D, the problem is decomposed into a series of sub-problems, and its solutions are initialised by the Glover operator and further optimised by the variable neighbourhood descent strategy. The weights assigned to the sub-problems are adapted dynamically according to a variable weight strategy, and a global update strategy is employed to update the solutions. A novel sharing and benefiting mechanism is proposed to implement coevolution among different sub-problems. Competitive mechanisms are modified by considering similar sub-problems to improve population quality. A criterion is designed to check whether a subproblem is stuck in the local optima. The comprehensive computational results demonstrate that MMBO/D outperforms other state-of-the-art multi-objective evolutionary algorithms (MOEAs) for the addressed problem.
引用
收藏
页码:1013 / 1038
页数:26
相关论文
共 43 条
[21]   Variable neighborhood search [J].
Mladenovic, N ;
Hansen, P .
COMPUTERS & OPERATIONS RESEARCH, 1997, 24 (11) :1097-1100
[22]  
Montgomery D. C., 2005, Design and analysis of experiments, V6th
[23]   A model and imperialist competitive algorithm for hybrid flow shops with sublots and setup times [J].
Naderi, B. ;
Yazdani, M. .
JOURNAL OF MANUFACTURING SYSTEMS, 2014, 33 (04) :647-653
[24]   Lot streaming in a two-stage assembly hybrid flow shop scheduling problem with a work shift constraint [J].
Nejati, Mohsen ;
Mahdavi, Iraj ;
Hassanzadeh, Reza ;
Mahdavi-Amiri, Nezam .
JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2016, 33 (07) :459-471
[25]   Multi-job lot streaming to minimize the weighted completion time in a hybrid flow shop scheduling problem with work shift constraint [J].
Nejati, Mohsen ;
Mahdavi, Iraj ;
Hassanzadeh, Reza ;
Mahdavi-Amiri, Nezam ;
Mojarad, MohamadSailm .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 70 (1-4) :501-514
[26]  
Pan Q, 2020, IEEE Transactions on Cybernetics
[27]   An Improved Artificial Bee Colony algorithm for real-world hybrid flowshop rescheduling in Steelmaking-refining-Continuous Casting process [J].
Peng, Kunkun ;
Pan, Quan-Ke ;
Gao, Liang ;
Zhang, Biao ;
Pang, Xinfu .
COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 122 :235-250
[28]   The hybrid flow shop scheduling problem [J].
Ruiz, Ruben ;
Antonio Vazquez-Rodriguez, Jose .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 205 (01) :1-18
[29]  
Song Dai-li, 2013, Computer Integrated Manufacturing Systems, V19, P1640
[30]   The impact of lot sizing and sequencing on manufacturing performance in a two-stage hybrid flow shop [J].
Tsubone, H ;
Ohba, M ;
Uetake, T .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (11) :3037-3053