共 43 条
[2]
Cheng M., 2013, IFAC P, V46, P448, DOI DOI 10.3182/20130619-3-RU-3018.00310
[3]
Cheng M, 2016, J GLOBAL OPTIM, V66, P263, DOI 10.1007/s10898-015-0298-z
[8]
GARNAUT R, 1992, ECONOMIC REFORM AND INTERNATIONALISATION: CHINA AND THE PACIFIC REGION, P1
[10]
Transfer batch scheduling for a two-stage flowshop with identical parallel machines at each stage
[J].
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE,
1997, 25 (05)
:547-555