Development of an Agile Requirements Risk Prioritization Method: A Design Science Research Study

被引:1
作者
Tuunanen, Tuure [1 ,2 ]
Vartiainen, Tero [3 ]
Kainulainen, Sanna [1 ]
Ebrahim, Mehdi [4 ]
机构
[1] Univ Jyvaskyla, Fac Informat Technol, Jyvaskyla, Finland
[2] Uppsala Univ, Dept Informat & Media, Uppsala, Sweden
[3] Univ Vaasa, Sch Technol & Innovat, Vaasa, Finland
[4] Adv Management Syst Ltd, London, England
来源
COMMUNICATIONS OF THE ASSOCIATION FOR INFORMATION SYSTEMS | 2023年 / 52卷
关键词
Information Systems Development; Agile Requirements Risk Prioritization Method; Design Science Research; SOFTWARE PROJECT RISK; INFORMATION-SYSTEMS; MODEL; MANAGEMENT;
D O I
10.17705/1CAIS.05226
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The practice of information systems development (ISD) has changed during the past two decades from very structured approaches to agile ISD methods. However, in the literature many methods available for managing requirements-related risks follow a structured approach to ISD. Few, if any, available methods offer solutions that prioritize requirements risks for agile ISD projects based on recognizing requirements-related risks and patterns in order to mitigate these. To fill this gap in the literature, we apply the design science research methodology to develop an agile requirements risk prioritization method together with industry experts (n=54) in Finland and New Zealand in a multi-year study. The method was developed by applying contingency theory, and our study makes an artifactual contribution to the literature. The method helps practitioners prioritize the overall requirements-related risks for ISD projects.
引用
收藏
页码:609 / 637
页数:30
相关论文
共 60 条
[1]  
Achimugu P, 2016, LECT NOTES COMPUT SC, V9655, P80, DOI 10.1007/978-3-662-49619-0_5
[2]   Artefactual and empirical contributions in information systems research [J].
Agerfalk, Par J. ;
Karlsson, Fredrik .
EUROPEAN JOURNAL OF INFORMATION SYSTEMS, 2020, 29 (02) :109-113
[3]   The impact of ERP on supply chain management:: Exploratory findings from a European Delphi study [J].
Akkermans, HA ;
Bogerd, P ;
Yücesan, E ;
van Wassenhove, LN .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 146 (02) :284-301
[4]   Quality requirements challenges in the context of large-scale distributed agile: An empirical study [J].
Alsaqaf, Wasim ;
Daneva, Maya ;
Wieringa, Roel .
INFORMATION AND SOFTWARE TECHNOLOGY, 2019, 110 :39-55
[5]  
ALTER S, 1978, SLOAN MANAGE REV, V20, P23
[6]  
[Anonymous], 1996, CONTINUOUS RISK MANA
[7]  
Barki H., 1993, Journal of Management Information Systems, V10, P203
[8]   An integrative contingency model of software project risk management [J].
Barki, H ;
Rivard, S ;
Talbot, J .
JOURNAL OF MANAGEMENT INFORMATION SYSTEMS, 2001, 17 (04) :37-69
[9]  
Barlow JB, 2011, COMMUN ASSOC INF SYS, V29
[10]  
Bergman M., 2002, Scandinavian Journal of Information Systems, V14, P37