Quality Risk Evaluation of Urban Rail Transit Construction Based on AHP-FCE Method

被引:2
|
作者
Ma, Shaoxiong [1 ]
Tian, Qing [1 ,2 ]
Zou, Chao [1 ,2 ]
Yang, Gongyin [1 ]
机构
[1] Shaanxi Railway Inst, Technol Dept, Weinan 714099, Peoples R China
[2] Xian Univ Technol, Sch Civil Engn & Architecture, Xian 710048, Peoples R China
关键词
METRO CONSTRUCTION; TUNNEL CONSTRUCTION; SAFETY MANAGEMENT; CHINA; CHALLENGES; GOVERNANCE; SYSTEMS; MODEL;
D O I
10.1155/2023/2187071
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The demand for urban transport is increasing globally, and urban rail transit is an important infrastructure for meeting this demand. The objectives of this study were to effectively control and prevent all types of risks in the construction of metro projects and improve the quality and safety control of urban metro project construction. First, 20 index factors were selected from the five dimensions of "man-machinery-materials-methods-environment" and constructed an index system for assessing urban metro construction quality risks. Second, the analytic hierarchy process (AHP) and fuzzy comprehensive evaluation (FCE) methods were used to comprehensively evaluate the construction quality risks of subway projects, and the weights of the secondary indices were determined. Finally, the importance of secondary indicators was evaluated using the integrated AHP-FCE method, and the model was applied to engineering practice for validation. The results indicated that the comprehensive AHP-FCE method has good adaptability and rationality and has practical application value for metro project construction quality and safety risk assessment. It can help prevent urban metro construction quality accidents and provides a novel idea for metro project construction quality risk assessment.
引用
收藏
页数:12
相关论文
共 50 条
  • [1] The study of Green Risk Assessment for Construction Project Based on "AHP-FCE" Method
    Xie Danfeng
    Guo Shurong
    Li Sulei
    PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 130 - 134
  • [2] AHP-FCE Based Physical Exercise Risk Evaluation Model
    吴怡之
    丁永生
    许红安
    Journal of Donghua University(English Edition), 2007, (05) : 667 - 671
  • [3] Teaching Quality Evaluation of Online Courses Based on AHP-FCE Evaluation Technology
    Huang R.
    International Journal of Emerging Technologies in Learning, 2023, 18 (13) : 91 - 103
  • [4] Risk assessment of bridge fire safety based on AHP-FCE method
    Sun, Bo
    Xiao, R. C.
    Cheng, Jin
    Huang, Jie
    LIFE-CYCLE OF STRUCTURAL SYSTEMS: DESIGN, ASSESSMENT, MAINTENANCE AND MANAGEMENT, 2015, : 1945 - 1951
  • [5] Research on Evaluation of Green Smart Building Based on Improved AHP-FCE Method
    Xu, Song
    Sun, Yao
    COMPUTATIONAL INTELLIGENCE AND NEUROSCIENCE, 2021, 2021
  • [6] The risk assessment of bridge design based on the AHP-FCE model
    Xiang, Yiqiang
    Wu, Qiangqiang
    Zhang, Tingting
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2010, 43 (SUPPL. 2): : 275 - 280
  • [7] Cutting tools evaluation model based on TRIZ and AHP-FCE
    Li, Xiaolong
    Zhao, Wu
    Wang, Chen
    Zheng, Yake
    Zeng, Jie
    Journal of Chemical and Pharmaceutical Research, 2014, 6 (04) : 465 - 473
  • [8] Risk Evaluation on UHV Power Transmission Construction Project Based on AHP and FCE Method
    Zhao, Huiru
    Guo, Sen
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2014, 2014
  • [9] Evaluation of radiation accident emergency drill based on AHP-FCE
    Meng F.
    Yang M.
    Wang H.
    Sun L.
    Fang J.
    Yang J.
    He Jishu/Nuclear Techniques, 2022, 45 (11):
  • [10] Application of AHP-FCE in optimizing mining method
    Gong, Sheng-Wu
    Cai, Ming-Yue
    Li, Xi-Bing
    Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2009, 26 (01): : 41 - 44