Field monitoring and analysis of soil deformation of curved steel pipe jacking in Gongbei tunnel

被引:13
作者
Zhang, Peng [1 ]
Zhang, Yunlong [1 ]
Ariaratnam, Samuel T. [1 ,2 ]
Ma, Baosong [3 ]
Zeng, Cong [1 ]
Liu, Kaixin [1 ]
机构
[1] China Univ Geosci Wuhan, Fac Engn, 388, Lumo Rd, Wuhan, Hubei, Peoples R China
[2] Arizona State Univ, Sch Sustainable Engn & Built Environm, 660, S Coll Ave, Tempe, AZ USA
[3] Sun Yat Sen Univ, Sch Civil Engn, 135, Xingang Xi Rd, Guangzhou, Guangdong, Peoples R China
关键词
Curved pipe jacking; Field monitoring; Ground deformation; Layered settlement; Lateral deformation; ROOF;
D O I
10.1016/j.tust.2023.105153
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
To ascertain the soil deformation law in the construction of curved pipe jacking, ground deformation, layered settlement and lateral deformation of deep soil have been analyzed by field monitoring of soil deformation data in different types of soil in the curved pipe jacking roof of Gongbei tunnel. The results show that the curved pipe jacking induced ground settlement groove curve shows asymmetry. The variation law of ground settlement and deep soil deformation in different soil is consistent, and the mud pressure, excavation face support force and friction resistance have great influence on the deep soil deformation, but the maximum deformation is related to the soil type. Adjacent curved pipe jacking construction will cause the accumulative deformation of surrounding soil, due to the supporting effect of the completed pipe jacking on surrounding soil, the accumulated value of this part of soil is small. The maximum settlement values of single curved pipe jacking are artificially fill > sand layer > mucky soil. during construction of adjacent jacking pipes, the cumulative deformation values are as follows: mucky soil > artificial fill > sand layer, indicating that the deformation of mucky soil is more significant under multiple disturbances. The soil loss caused by relative position of curved pipe jacking and tunnel is the main reason for the ground settlement deviation. The calculated result of modified Peck formula is accordance with measured values, which can be used to predicate the surface deformation caused by curved pipe jacking.
引用
收藏
页数:17
相关论文
共 20 条
  • [1] Chen S.T., 2009, J CHONGQING JIAOTONG, V28, P861
  • [2] Chen X.X., 2019, WATER RESOUR HYDROPO, V50, P73, DOI [10.13928/j.cnki.wrahe.2019.S1.013, DOI 10.13928/J.CNKI.WRAHE.2019.S1.013]
  • [3] Field mechanical properties of large section concrete pipes during jacking in fractured moderately weathered siltstone
    Feng, Xin
    Zhang, Peng
    Chen, Xiaolong
    Zhang, Yunlong
    Ma, Baosong
    Liu, Kaixin
    Xu, Tianshuo
    Zeng, Cong
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2023, 131
  • [4] Hu X.D., 2014, Mod. Tunn. Technol, V51, P92, DOI [10.13807/j.cnki.mtt.2014.05.014, DOI 10.13807/J.CNKI.MTT.2014.05.014]
  • [5] Jian Li, 2014, 2014 International Conference on Pipelines and Trenchless Technology. Proceedings, P422
  • [6] SUBSIDENCE OWING TO TUNNELING .1. ESTIMATING THE GAP PARAMETER
    LEE, KM
    ROWE, RK
    LO, KY
    [J]. CANADIAN GEOTECHNICAL JOURNAL, 1992, 29 (06) : 929 - 940
  • [7] Tunnel boring machine tunneling-induced ground settlements in soft clay and influence of excavation parameters
    Li, Zhong-Chao
    Chen, Ren-Peng
    Meng, Fan-Yan
    Ye, Jun-Neng
    [J]. Zhejiang Daxue Xuebao (Gongxue Ban)/Journal of Zhejiang University (Engineering Science), 2015, 49 (07): : 1268 - 1275
  • [8] Analytical prediction for tunneling-induced ground movements in clays
    Loganathan, N
    Poulos, HG
    [J]. JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 1998, 124 (09) : 846 - 856
  • [9] O'Reilly M.P., 1982, SETTLEMENTS TUNNELS, P173
  • [10] Peck R.B., 1969, P 7 INT C SOIL MECH, P225, DOI DOI 10.1201/B12748-79