Mechanical behaviour of steel-concrete joint in hybrid girder cable-stayed bridge

被引:5
|
作者
Zhao, Lanting [1 ]
Pu, Guangning [1 ]
Yuan, Yangguang [1 ]
Guo, Qi [1 ]
Yu, Yongliang [2 ]
机构
[1] Xian Univ Architecture & Technol, Univ Shaanxi Prov, Engn Res Ctr Green Construct & Smart Maintenance U, Sch Civil Engn, Xian 710055, Shaanxi, Peoples R China
[2] Jinghong Transportat Bur, Xishuangbanna 666100, Peoples R China
关键词
Bridge engineering; Hybrid girder cable-stayed bridge; Steel-concrete joint; Model experiment; Mechanical performance; Force transfer mechanism;
D O I
10.1016/j.istruc.2023.105239
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A steel-concrete joint section test model was constructed based on a mixed-scale ratio of the Lancang River hybrid girder cable-stayed bridge in Jinghong City, Yunnan Province. The internal forces and test loading values during normal operations were determined using finite element analysis. The performance was analysed by determining the mechanical indicators at key positions during the loading process. A finite element model of the test girder section was established to analyse the force transmission mechanism of the studied steel-concrete joint section. The test results showed that the centroid of the section moved upward during force transfer from the concrete to the steel girder. The relative slippage at the steel-concrete interface resulted in local unloading and an uneven distribution of longitudinal stresses in the crosswise direction. In addition, the cooperative bearing of the steel-concrete joint girder was transformed to a single bearing of the concrete girder, leading to a monotonic variation of stresses in the web plate. The simulation results showed that the surface plate force-sharing ratio of the composite bridge was the highest. In addition, the force-sharing ratios under the axial force and bending moment scenarios were 57.65% and 78.91%, respectively, indicating that the investigated steel-concrete joint demonstrated good stiffness transition stability. Furthermore, four force transfer types were identified in the steel-concrete joints. The research outcomes provide a fundamental basis for the rational design of joint components applied in hybrid girder cable-stayed bridges.
引用
收藏
页数:18
相关论文
共 50 条
  • [21] Research on Construction Control of Semi Hybrid Steel-concrete Comoposite Cable-stayed Bridge
    Qi, Tiedong
    Yuan, Qin
    Ma, Lei
    Liu, Dianyuan
    Wang, Xiaolei
    2020 4TH INTERNATIONAL WORKSHOP ON RENEWABLE ENERGY AND DEVELOPMENT (IWRED 2020), 2020, 510
  • [22] Mechanical Behavior of Steel-Concrete Joint in a Bidirectional Curved Pylon of a Long-Span Cable-Stayed Bridge
    Shi, Zhou
    Zhong, Meiling
    Gu, Jiachang
    Jiang, Feng
    Zhang, Tongzhuo
    JOURNAL OF BRIDGE ENGINEERING, 2023, 28 (03)
  • [23] Analysis of Mechanical Property of Steel-Concrete Joint Section in Partially-Earth-Anchored Cable-Stayed Bridge
    Yang, Yan
    Qin, Zuowei
    Liao, Yuan
    Tao, Chenliang
    Bridge Construction, 2024, 54 (04): : 93 - 98
  • [24] Study on mechanical behavior and load transfer mechanism of steel-concrete composite joint of cable-stayed bridge pylon
    Southwest Jiaotong University, Chengdu 610031, China
    Tumu Gongcheng Xuebao, 3 (88-96):
  • [25] Mechanical properties of an innovative steel-concrete joint for high-speed railway long-span hybrid girder cable-stayed bridges
    Shi, Zhou
    Gu, Jiachang
    Li, Yingming
    Zhang, Ying
    Zhao, Xupo
    ENGINEERING STRUCTURES, 2024, 300
  • [26] Mechanical behavior of steel-concrete composite joints in railway hybrid cable-stayed bridges
    Yang, Shili
    Pu, Qianhui
    Shi, Zhou
    Hong, Yu
    JOURNAL OF CONSTRUCTIONAL STEEL RESEARCH, 2020, 173
  • [27] Fatigue Performance of an Innovative Steel-Concrete Joint in Long-Span Railway Hybrid Box Girder Cable-Stayed Bridges
    Pu, Qianhui
    Yang, Shili
    Shi, Zhou
    Hong, Yu
    Zhou, Yang
    JOURNAL OF BRIDGE ENGINEERING, 2021, 26 (02)
  • [28] Experimental Study on Mechanical and Deformation Performance of Steel-concrete Composite Box Girder of High-speed Railway Cable-stayed Bridge
    School of Civil Engineering, Southwest Jiaotong University, Chengdu
    610031, China
    不详
    430063, China
    Tiedao Xuebao, 1 (111-118): : 111 - 118
  • [29] Experimental Study of the Steel-Concrete Connection in Hybrid Cable-Stayed Bridges
    He, Jun
    Liu, Yuqing
    Pei, Bingzhi
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2014, 28 (03) : 559 - 570
  • [30] Second Dolsan Bridge: A Cable-Stayed Bridge with a Concrete Edge Girder
    Park, Dae Yong
    Lee, Bo Be
    STRUCTURAL ENGINEERING INTERNATIONAL, 2012, 22 (01) : 44 - 48