Combined heat and power production in a pilot-scale biomass gasification system: Experimental study and kinetic simulation using ASPEN Plus
被引:26
作者:
HajiHashemi, MohammadSina
论文数: 0引用数: 0
h-index: 0
机构:
K N Toosi Univ Technol, Fac Mech Engn, Dept Energy Syst Engn, Tehran, IranK N Toosi Univ Technol, Fac Mech Engn, Dept Energy Syst Engn, Tehran, Iran
HajiHashemi, MohammadSina
[1
]
Mazhkoo, Shahin
论文数: 0引用数: 0
h-index: 0
机构:
K N Toosi Univ Technol, Fac Mech Engn, Dept Energy Syst Engn, Tehran, Iran
Univ Guelph, Sch Engn, Guelph, ON N1G 2W1, CanadaK N Toosi Univ Technol, Fac Mech Engn, Dept Energy Syst Engn, Tehran, Iran
Mazhkoo, Shahin
[1
,2
]
Dadfar, Hossein
论文数: 0引用数: 0
h-index: 0
机构:
K N Toosi Univ Technol, Fac Mech Engn, Dept Energy Syst Engn, Tehran, IranK N Toosi Univ Technol, Fac Mech Engn, Dept Energy Syst Engn, Tehran, Iran
Dadfar, Hossein
[1
]
Livani, Ehsan
论文数: 0引用数: 0
h-index: 0
机构:
Niroo Res Inst NRI, Energy & Environm Res Ctr, Tehran, IranK N Toosi Univ Technol, Fac Mech Engn, Dept Energy Syst Engn, Tehran, Iran
Livani, Ehsan
[3
]
Varnosefaderani, Aliakbar Naseri
论文数: 0引用数: 0
h-index: 0
机构:
Renewable Energy & Energy Efficiency Org, Tehran, IranK N Toosi Univ Technol, Fac Mech Engn, Dept Energy Syst Engn, Tehran, Iran
Varnosefaderani, Aliakbar Naseri
[4
]
论文数: 引用数:
h-index:
机构:
Pourali, Omid
[1
]
论文数: 引用数:
h-index:
机构:
Nobar, Shima Najafi
[1
,5
]
论文数: 引用数:
h-index:
机构:
Dutta, Animesh
[2
]
机构:
[1] K N Toosi Univ Technol, Fac Mech Engn, Dept Energy Syst Engn, Tehran, Iran
[2] Univ Guelph, Sch Engn, Guelph, ON N1G 2W1, Canada
[3] Niroo Res Inst NRI, Energy & Environm Res Ctr, Tehran, Iran
[4] Renewable Energy & Energy Efficiency Org, Tehran, Iran
This study highlights the opportunities and challenges of pomegranate wood chips (PWC) gasification in a pilot -scale multi-reactor gasification system integrated with an internal combustion engine for combined heat and power generation. PWC with a higher heating value of 19.54 MJ/kg were converted into syngas in a downdraft gasifier and then the resultant syngas was utilized to generate power at two electrical power loads of 7 and 10 kW. The experimental results showed that lower electrical output (7 kW) leads to syngas production with higher H2 and CO molar concentrations (21.5% H2 and 30.08% CO). Increasing the power load to 10 kW resulted in a 13.35% and 13.76% reduction in H2 and CO molar concentrations, respectively. ASPEN Plus coupled with an external FORTRAN subroutine was used to kinetically simulate the experimental system. Compared to the equilibrium and modified equilibrium models available in the literature, kinetic simulation results showed perfect agreement with the experimental results; it gave syngas composition with ideal accuracy and acceptable mean absolute percentage errors of 8.91 and 1.98 for H2 and CO, respectively.
机构:
Masdar Inst Sci & Technol MI, Mech Engn Program, Waste Energy Lab 2, Abu Dhabi, U Arab EmiratesMasdar Inst Sci & Technol MI, Mech Engn Program, Waste Energy Lab 2, Abu Dhabi, U Arab Emirates
机构:
Masdar Inst Sci & Technol MI, Mech Engn Program, Waste Energy Lab 2, Abu Dhabi, U Arab EmiratesMasdar Inst Sci & Technol MI, Mech Engn Program, Waste Energy Lab 2, Abu Dhabi, U Arab Emirates