Supplier-remanufacturing and manufacturer-remanufacturing in a closed-loop supply chain with remanufacturing cost disruption

被引:21
作者
Huang, Yanting [1 ]
Zheng, Benrong [2 ]
Wang, Zongjun [3 ]
机构
[1] Shenzhen Univ, Coll Management, Shenzhen 518060, Peoples R China
[2] Huazhong Agr Univ, Sch Econ & Management, Wuhan 430070, Peoples R China
[3] Huazhong Univ Sci & Technol, Sch Management, Wuhan 430074, Peoples R China
基金
中国国家自然科学基金;
关键词
Closed-loop supply chain; Cost disruption; Supplier-remanufacturing; Game theory; PRODUCTION DECISIONS; DEMAND DISRUPTIONS; CHANNEL; COORDINATION; COMPETITION; SELECTION; PRICE; PERFORMANCE; STRATEGIES; PRODUCTS;
D O I
10.1007/s10479-021-04230-w
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper studies remanufacturing cost disruption in a closed-loop supply chain consisting of a supplier, a manufacturer and a retailer. Specifically, the proposed work compares supplier-remanufacturing and manufacturer-remanufacturing modes with respect to equilibrium strategies and chain members' profits, and analyzes the impacts of different disruption cases on each remanufacturing mode. Stackelberg game is applied to acquire equilibrium pricing decisions of each disruption case and it is found that the manufacturer-remanufacturing and supplier-remanufacturing modes have identical robustness. In manufacturer-remanufacturing mode, when the remanufacturing cost faces negative disruption, the manufacturer prefers to elevate the acquisition price and remanufacture more to improve profitability. In this case, the supplier will set a relatively lower wholesale price of components due to the marketing competition from the manufacturer, and the retailer can obtain more revenues. In supplier-remanufacturing mode, since the remanufactured components may cannibalize new component sales, the supplier will forgo some profits from new components in order to extract more profits from remanufacturing activities only if the negative disruption of remanufacturing cost is large enough. These results can provide a new insight into supplier-remanufacturing with cost disruption in a closed-loop supply chain.
引用
收藏
页码:61 / 92
页数:32
相关论文
共 48 条
[1]   Dynamic supplier selection model under two-echelon supply network [J].
Ahmad, Md Tanweer ;
Mondal, Sandeep .
EXPERT SYSTEMS WITH APPLICATIONS, 2016, 65 :255-270
[2]   Stakeholder Perspectives on E-Waste Take-Back Legislation [J].
Atasu, Atalay ;
Ozdemir, Oznur ;
Van Wassenhove, Luk N. .
PRODUCTION AND OPERATIONS MANAGEMENT, 2013, 22 (02) :382-396
[3]   So what if remanufacturing cannibalizes my new product sales? [J].
Atasu, Atalay ;
Guide, V. Daniel R., Jr. ;
Van Wassenhove, Luk N. .
CALIFORNIA MANAGEMENT REVIEW, 2010, 52 (02) :56-76
[4]  
Bakal IS, 2006, PROD OPER MANAG, V15, P407, DOI 10.1111/j.1937-5956.2006.tb00254.x
[5]  
Bhattacharya S, 2006, PROD OPER MANAG, V15, P421, DOI 10.1111/j.1937-5956.2006.tb00255.x
[6]   Information sharing under different warranty policies with cost sharing in supply chains [J].
Cai, Keyuan ;
He, Shuguang ;
He, Zhen .
INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2020, 27 (03) :1550-1572
[7]   Channel leadership, performance and coordination in closed loop supply chains [J].
Choi, Tsan-Ming ;
Li, Yongjian ;
Xu, Lei .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 146 (01) :371-380
[8]   Incentive strategies for an optimal recovery program in a closed-loop supply chain [J].
De Giovanni, Pietro ;
Reddy, Puduru V. ;
Zaccour, Georges .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 249 (02) :605-617
[9]   Strategic Behavior of Suppliers in the Face of Production Disruptions [J].
Demirel, Suleyman ;
Kapuscinski, Roman ;
Yu, Man .
MANAGEMENT SCIENCE, 2018, 64 (02) :533-551
[10]   Proactive and reactive models for disaster resilient supply chain [J].
Elluru, Sahitya ;
Gupta, Hardik ;
Kaur, Harpreet ;
Singh, Surya Prakash .
ANNALS OF OPERATIONS RESEARCH, 2019, 283 (1-2) :199-224