Reuse of Locally Available Paddy Waste in Sugar Industries: A Potential Source of Additional Income for Sugar Mills During Sugarcane Off-Season

被引:0
作者
Jyothsna, G. [1 ]
Bahurudeen, A. [1 ]
Sahu, Prasanta K. [1 ]
机构
[1] Birla Inst Technol & Sci Pilani, Dept Civil Engn, Hyderabad Campus, Hyderabad 500078, India
关键词
Biomass power plant; Sugar mills; Sensitivity analysis; Rice Husk; Network analysis; POWER-PLANT; LOCATION;
D O I
10.1007/s12355-024-01395-z
中图分类号
S3 [农学(农艺学)];
学科分类号
0901 ;
摘要
Rice husk is abundantly available in the local vicinity of sugar mills; hence it can be utilised as biomass in the nearby cogeneration boilers of sugar mills. Consequently, sugar mills will produce additional revenue during the sugarcane off-season. This mitigates the need to develop multiple new biomass-based power facilities. Hence, synergistic use of rice husk in the sugar mills is attempted in the study. Besides, this study also aims to identify suitable sites for the establishment of new biomass-powered facilities by examining the feasibility of utilising the pre-existing sugar mills and thermal plants. Location suitability analysis and sensitivity analysis were performed to determine and assess the stability of the suitability index results. The findings of the study demonstrated that the mean suitability index value of Telangana state is 29.75. A total of 12 out of the 33 districts were identified as having a suitability value that exceeds the average suitability index, indicating the necessity for the establishment of new plants. The criteria C1 and C2 have significant influence on the location suitability when compared with criteria C3. 10 locations were identified to be suitable in Telangana state for the establishment of new biomass-based power plants. In addition, 11 pre-existing sugar mills and thermal power plants are identified in the radius range of 2-90 km, which has the potential to generate additional revenue. Only 1.2% of carbon is found to be emitted in rice husk-based power generation compared with coal power generation.
引用
收藏
页码:752 / 766
页数:15
相关论文
共 18 条
  • [1] [Anonymous], 2022, TELANGANA SOCIO EC O
  • [2] Census of India, 2011, Census tables
  • [3] Central Electrical Authority of India, 2021, PDM DIVISION LIST TH
  • [4] Chungsangunsit T., 2009, International Journal of Mechanical, Aerospace, Industrial, Mechatronic and Manufacturing Engineering, V3, P625
  • [5] Spatial optimization of biomass power plant site using fuzzy analytic network process
    Davtalab, Mehri
    Alesheikh, Ali Asghar
    [J]. CLEAN TECHNOLOGIES AND ENVIRONMENTAL POLICY, 2018, 20 (05) : 1033 - 1046
  • [6] Fuzzy MCDM framework for locating a nuclear power plant in Turkey
    Erol, Ismail
    Sencer, Safiye
    Ozmen, Asli
    Searcy, Cory
    [J]. ENERGY POLICY, 2014, 67 : 186 - 197
  • [7] Islam M.M., 2004, P 2 BSME ASME INT C, P7
  • [8] Looss Bertrand., 2017, HDB UNCERTAINTY QUAN, DOI [10.1007/978-3-319-12385-1, DOI 10.1007/978-3-319-12385-1]
  • [9] On sensitivity analysis for a class of decision systems
    Meszaros, C
    Rapcsak, T
    [J]. DECISION SUPPORT SYSTEMS, 1996, 16 (03) : 231 - 240
  • [10] Ministry of Agriculture and Farmers Welfare, 2021, AREA PRODUCTION STAT