Minimizing the expected maximum lateness for a job shop subject to stochastic machine breakdowns

被引:3
|
作者
Zambrano-Rey, Gabriel Mauricio [1 ]
Gonzalez-Neira, Eliana Maria [1 ]
Forero-Ortiz, Gabriel Fernando [1 ]
Ocampo-Monsalve, Maria Jose [1 ]
Rivera-Torres, Andrea [1 ]
机构
[1] Pontificia Univ Javeriana, Dept Ingn Ind, Carrera 7 40-62, Bogota, Colombia
关键词
Stochastic job shop scheduling; Maximum lateness; Machine breakdowns; Simheuristics; Tabu search;
D O I
10.1007/s10479-023-05592-z
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper addresses a stochastic job shop scheduling problem with sequence-dependent setup times, aiming to minimize the expected maximum lateness. The stochastic nature is modeled by considering uncertain times between failures (TBF) and uncertain times to repair (TTR). To tackle this problem, a simheuristic approach is proposed, which combines a tabu search (TS) algorithm with Monte Carlo simulation. A total of 320 instances were used to conduct multiple experiments. Instances were generated with two distributions to study the behavior of stochastic TTR and TBF under log-normal and exponential distributions. Firstly, the performance of the simheuristic was evaluated for small instances by comparing it with the simulation of optimal solutions obtained with a mixed-integer linear programming (MILP) model. The simheuristic approach demonstrated an average improvement of around 7% compared to the simulation of MILP model solutions. Secondly, the simheuristic performance was evaluated for medium and large-size instances by comparing it with the simulation of the solutions obtained by the earliest due date (EDD) and process time plus work in the next queue plus negative slack (PT + WINQ + SL) dispatching rules. The results showed an average improvement of around 11% compared to EDD and 14% compared to PT + WINQ + SL. Furthermore, the results highlight that even when the two distributions have the same expected value and coefficient of variation, they can yield different expected maximum lateness values. This emphasizes the importance of precise distribution fitting when solving real cases to achieve effective scheduling performance.
引用
收藏
页码:801 / 833
页数:33
相关论文
共 34 条
  • [1] Minimizing maximum promptness and maximum lateness on a single machine
    Hoogeveen, JA
    MATHEMATICS OF OPERATIONS RESEARCH, 1996, 21 (01) : 100 - 114
  • [2] Scheduling job shop problems with operators with respect to the maximum lateness
    Benkalai, Imene
    Rebaine, Djamal
    Baptiste, Pierre
    RAIRO-OPERATIONS RESEARCH, 2020, 54 (02) : 555 - 568
  • [3] Heuristics and lower bound for minimizing maximum lateness on a batch processing machine with incompatible job families
    Li, XiaoLin
    Li, YuPeng
    Huang, YanLi
    COMPUTERS & OPERATIONS RESEARCH, 2019, 106 : 91 - 101
  • [4] Flexible job shop scheduling with stochastic machine breakdowns by an improved tuna swarm optimization algorithm
    Fan, Chengshuai
    Wang, Wentao
    Tian, Jun
    JOURNAL OF MANUFACTURING SYSTEMS, 2024, 74 : 180 - 197
  • [5] Stochastic flow shop scheduling with random machine breakdowns
    Li, Sufen
    Zhu, Yunlong
    Complexity Analysis and Control for Social, Economical and Biological Systems, 2006, 1 : 60 - 68
  • [6] Minimizing Maximum Lateness on Unbounded Single Batching Machine with Family Jobs
    郑睿
    李宏余
    Journal of Donghua University(English Edition), 2010, 27 (05) : 639 - 642
  • [7] Fuzzy Resource Allocation Problem for Minimizing Maximum Lateness on a Single Machine
    Harikrishnan, Kanthen K.
    Ishii, Hiroaki
    INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2006, 5 (02): : 97 - 101
  • [8] Single machine stochastic JIT scheduling problem subject to machine breakdowns
    TANG HengYong~+ ZHAO ChuanLi CHENG CongDian College of Mathematics and Systems Science
    ScienceinChina(SeriesA:Mathematics), 2008, (02) : 273 - 292
  • [9] Single machine stochastic JIT scheduling problem subject to machine breakdowns
    HengYong Tang
    ChuanLi Zhao
    CongDian Cheng
    Science in China Series A: Mathematics, 2008, 51 : 273 - 292
  • [10] Single machine stochastic JIT scheduling problem subject to machine breakdowns
    Tang HengYong
    Zhao ChuanLi
    Cheng CongDian
    SCIENCE IN CHINA SERIES A-MATHEMATICS, 2008, 51 (02): : 273 - 292