A case-based reasoning approach for solving schedule delay problems in prefabricated construction projects

被引:25
作者
Xie, Linlin [1 ]
Wu, Sisi [1 ]
Chen, Yajiao [2 ]
Chang, Ruidong [3 ]
Chen, Xiaoyan [4 ]
机构
[1] South China Univ Technol, Sch Civil Engn & Transportat, Guangzhou, Peoples R China
[2] Tongji Univ, Sch Econ & Management, Shanghai, Peoples R China
[3] Univ Adelaide, Sch Architecture & Civil Engn, Adelaide, Australia
[4] Beijing Univ Civil Engn & Architecture, Sch Urban Econ & Management, Beijing, Peoples R China
基金
中国国家自然科学基金;
关键词
Schedule delay; Prefabricated construction projects; Case-based reasoning; Experience mining; Similarity calculation; DECISION-MAKING; HOUSING PRODUCTION; CAUSATIVE FACTORS; RISK-ASSESSMENT; MINING SYSTEM; SWOT ANALYSIS; SUPPLY CHAIN; MANAGEMENT; PERFORMANCE; SELECTION;
D O I
10.1016/j.autcon.2023.105028
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The project schedule delay problem has received considerable attention for its significance in impeding project performance. Compared to conventional projects, prefabricated construction projects could suffer more from schedule delay problems. A possible solution to such problems is to provide countermeasures by referring to valuable experience of historical cases. This paper proposes a case-based reasoning (CBR) model to leverage past experience and knowledge to address the schedule delay problems in prefabricated construction projects. The study explains the development processes of the CBR model in detail, including the case base construction, case retrieval, case reuse and update. Subsequently, the study develops the CBR system and presents a case study to demonstrate the validity and practicality of the proposed approach. This study provides a potential tool to facilitate schedule management of prefabricated construction projects. It offers an effective reference for decision-makers, such as project managers, to tackle schedule delays through experience mining.
引用
收藏
页数:16
相关论文
共 50 条
[21]   Schedule delay analysis of prefabricated housing production: A hybrid dynamic approach [J].
Li, Clyde Zhengdao ;
Hong, Jingke ;
Fan, Cheng ;
Xu, Xiaoxiao ;
Shen, Geoffrey Qiping .
JOURNAL OF CLEANER PRODUCTION, 2018, 195 :1533-1545
[22]   A Case-Based Reasoning Approach to GBM Evolution [J].
Mendonca, Ana ;
Pereira, Joana ;
Reis, Rita ;
Alves, Victor ;
Abelha, Antonio ;
Ferraz, Filipa ;
Neves, Joao ;
Ribeiro, Jorge ;
Vicente, Henrique ;
Neves, Jose .
COMPUTATIONAL COLLECTIVE INTELLIGENCE, ICCCI 2018, PT II, 2018, 11056 :489-498
[23]   A Case-Based Reasoning approach to robot selection [J].
Chang, Guanghsu A. ;
Sims, J. Paul .
Manufacturing Engineering and Materials Handling, 2005 Pts A and B, 2005, 16 :943-951
[24]   A CASE-BASED REASONING APPROACH TO PROGRAM SYNTHESIS [J].
Korukhova, Yulia ;
Fastovets, Nikolay .
KEOD 2010: Proceedings of the International Conference on Knowledge Engineering and Ontology Development, 2010, :335-338
[25]   A case-based reasoning approach to planning for disassembly [J].
Zeid, I ;
Gupta, SM ;
Bardasz, T .
JOURNAL OF INTELLIGENT MANUFACTURING, 1997, 8 (02) :97-106
[26]   A case-based reasoning approach to planning for disassembly [J].
IBRAHIM ZEID ;
SURENDRA M.GUPTA ;
THEODORE BARDASZ .
Journal of Intelligent Manufacturing, 1997, 8 :97-106
[27]   Construction Method of Tender Document Based on Case-based Reasoning [J].
Zhou, T. T. ;
Gao, X. D. ;
Wei, G. Y. .
INTERNATIONAL JOURNAL OF COMPUTERS COMMUNICATIONS & CONTROL, 2021, 16 (03) :1-20
[28]   A Case-Based Reasoning Approach for the Cybersecurity Incident Recording and Resolution [J].
Nunes, Raul Ceretta ;
Colome, Marcelo ;
Barcelos, Fabio Andre ;
Garbin, Marcelo ;
Paulus, Gustavo Bathu ;
De Lima Silva, Luis Alvaro .
INTERNATIONAL JOURNAL OF SOFTWARE ENGINEERING AND KNOWLEDGE ENGINEERING, 2019, 29 (11-12) :1607-1627
[29]   An Approach Transmutation-Based in Case-Based Reasoning [J].
Bouabana-Tebibel, Thouraya ;
Rubin, Stuart H. ;
Hoadjli, Yasmine ;
Benaziez, Idriss .
QUALITY SOFTWARE THROUGH REUSE AND INTEGRATION, 2018, 561 :24-41
[30]   A Case-Based Reasoning Approach for Evaluating and Selecting Human Resource Management Information Systems Projects [J].
Wibowo, Santoso .
INFORMATION COMPUTING AND APPLICATIONS, 2011, 7030 :17-24