A case-based reasoning approach for solving schedule delay problems in prefabricated construction projects

被引:18
|
作者
Xie, Linlin [1 ]
Wu, Sisi [1 ]
Chen, Yajiao [2 ]
Chang, Ruidong [3 ]
Chen, Xiaoyan [4 ]
机构
[1] South China Univ Technol, Sch Civil Engn & Transportat, Guangzhou, Peoples R China
[2] Tongji Univ, Sch Econ & Management, Shanghai, Peoples R China
[3] Univ Adelaide, Sch Architecture & Civil Engn, Adelaide, Australia
[4] Beijing Univ Civil Engn & Architecture, Sch Urban Econ & Management, Beijing, Peoples R China
基金
中国国家自然科学基金;
关键词
Schedule delay; Prefabricated construction projects; Case-based reasoning; Experience mining; Similarity calculation; DECISION-MAKING; HOUSING PRODUCTION; CAUSATIVE FACTORS; RISK-ASSESSMENT; MINING SYSTEM; SWOT ANALYSIS; SUPPLY CHAIN; MANAGEMENT; PERFORMANCE; SELECTION;
D O I
10.1016/j.autcon.2023.105028
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The project schedule delay problem has received considerable attention for its significance in impeding project performance. Compared to conventional projects, prefabricated construction projects could suffer more from schedule delay problems. A possible solution to such problems is to provide countermeasures by referring to valuable experience of historical cases. This paper proposes a case-based reasoning (CBR) model to leverage past experience and knowledge to address the schedule delay problems in prefabricated construction projects. The study explains the development processes of the CBR model in detail, including the case base construction, case retrieval, case reuse and update. Subsequently, the study develops the CBR system and presents a case study to demonstrate the validity and practicality of the proposed approach. This study provides a potential tool to facilitate schedule management of prefabricated construction projects. It offers an effective reference for decision-makers, such as project managers, to tackle schedule delays through experience mining.
引用
收藏
页数:16
相关论文
共 50 条
  • [1] A knowledge-based risk management tool for construction projects using case-based reasoning
    Okudan, Ozan
    Budayan, Cenk
    Dikmen, Irem
    EXPERT SYSTEMS WITH APPLICATIONS, 2021, 173
  • [2] A case-based reasoning approach for estimating the costs of pump station projects
    Marzouk, Mohamed M.
    Ahmed, Rasha M.
    JOURNAL OF ADVANCED RESEARCH, 2011, 2 (04) : 289 - 295
  • [3] Case-Based Reasoning Approach to Construction Safety Hazard Identification: Adaptation and Utilization
    Goh, Y. M.
    Chua, D. K. H.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2010, 136 (02) : 170 - 178
  • [4] Investigation of the case-based reasoning retrieval process to estimate resources in construction projects
    De Soto, Borja Garcia
    Adey, Bryan T.
    CREATIVE CONSTRUCTION CONFERENCE 2015, SELECTED PAPERS, 2015, 123 : 169 - 181
  • [5] Predicting the Cost Outcome of Construction Quality Problems Using Case-Based Reasoning (CBR)
    Dogan, Neset Berkay
    Ayhan, Bilal Umut
    Kazar, Gokhan
    Saygili, Murathan
    Ayozen, Yunus Emre
    Tokdemir, Onur Behzat
    BUILDINGS, 2022, 12 (11)
  • [6] Supporting Creative Problem Solving with a Case-Based Reasoning System
    Althuizen, Niek
    Wierenga, Berend
    JOURNAL OF MANAGEMENT INFORMATION SYSTEMS, 2014, 31 (01) : 309 - 340
  • [7] A Case-Based Reasoning Approach to Automating the Construction of Multiple Choice Questions
    McSherry, David
    CASE-BASED REASONING RESEARCH AND DEVELOPMENT, 18TH INTERNATIONAL CONFERENCE ON CASE-BASED REASONING, ICCBR 2010, 2010, 6176 : 406 - 420
  • [8] Case-based reasoning approach for supporting building green retrofit decisions
    Zhao, Xue
    Tan, Yongtao
    Shen, Liyin
    Zhang, Guomin
    Wang, Jinhuan
    BUILDING AND ENVIRONMENT, 2019, 160
  • [9] The application of case-based reasoning in construction management research: An overview
    Hu, Xin
    Xia, Bo
    Skitmore, Martin
    Chen, Qing
    AUTOMATION IN CONSTRUCTION, 2016, 72 : 65 - 74
  • [10] Improving case-based reasoning in solving optimization problems using Bayesian optimization algorithm
    Kaedi, Marjan
    Ghasem-Aghaee, Nasser
    INTELLIGENT DATA ANALYSIS, 2012, 16 (02) : 199 - 210