No-Idle Flow Shop Scheduling with Deteriorating Jobs and Common Due Date Under Dominating Machines

被引:20
作者
Lv, Dan-Yang [1 ]
Wang, Ji-Bo [1 ]
机构
[1] Shenyang Aerosp Univ, Sch Mechatron Engn, Shenyang 110136, Peoples R China
关键词
Scheduling; dominating relationships; deterioration effects; common due date; flow shop; SINGLE-MACHINE; ASSIGNMENT; MINIMIZATION; TIMES;
D O I
10.1142/S0217595924500039
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
The phenomenon of deterioration effects can reduce production efficiency caused by extended start time or other factors. Based on it, this paper considers the scheduling situations of the common due date assignment in a no-idle flow shop scheduling environment. Under the given four dominating relationships (i.e., increasing, decreasing, increasing-decreasing and decreasing-increasing dominating machines, correspondingly expressed as idm, ddm, idm-ddm and ddm-idm) between machines, the objective functions are, respectively, to minimize (1) the weighted sum of common due date and total earliness; and (2) the weighted sum of common due date, total earliness and total penalty factors of tardy jobs. It is verified that these problems can be solved in polynomial time under four dominating relationships.
引用
收藏
页数:19
相关论文
共 42 条
  • [1] Benders decomposition for the mixed no-idle permutation flowshop scheduling problem
    Bektas, Tolga
    Hamzadayi, Alper
    Ruiz, Ruben
    [J]. JOURNAL OF SCHEDULING, 2020, 23 (04) : 513 - 523
  • [2] A Note on Multimachine Scheduling with Weighted Early/Late Work Criteria and Common Due Date
    Cao, Kerang
    Chen, Xin
    Choi, Kwang-nam
    Liang, Yage
    Miao, Qian
    Zhang, Xingong
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021
  • [3] Two-agent single-machine scheduling with cumulative deterioration
    Chen, Ren-Xia
    Li, Shi-Sheng
    [J]. 4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2019, 17 (02): : 201 - 219
  • [4] Fully polynomial time approximation scheme to maximize early work on parallel machines with common due date
    Chen, Xin
    Liang, Yage
    Sterna, Malgorzata
    Wang, Wen
    Blazewicz, Jacek
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2020, 284 (01) : 67 - 74
  • [5] Chen Y, 2023, ASIA PACIFIC J OPERA, V40
  • [6] On optimal due date assignment without restriction and resource allocation in group technology scheduling
    Chen, Ying
    Ma, Xiaole
    Zhang, Guiqing
    Cheng, Yongxi
    [J]. JOURNAL OF COMBINATORIAL OPTIMIZATION, 2023, 45 (02)
  • [7] Scheduling jobs with general linear deterioration to minimize total weighted number of late jobs
    Feng, Yifu
    Geng, Xin-Na
    Lv, Dan-Yang
    Wang, Ji-Bo
    [J]. OPTIMIZATION LETTERS, 2024, 18 (05) : 1217 - 1235
  • [8] Study on Due-Date Assignment Scheduling with Setup Times and General Truncated Learning Effects
    Feng, Yifu
    Hu, Zonghai
    Si, Rui
    Wang, Ji-Bo
    [J]. ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2024, 41 (01)
  • [9] Gawiejnowicz S., 2020, Models and algorithms for time-dependent scheduling
  • [10] Common due date assignment scheduling for a no-wait flowshop with convex resource allocation and learning effect
    Geng, Xin-Na
    Wang, Ji-Bo
    Bai, Danyu
    [J]. ENGINEERING OPTIMIZATION, 2019, 51 (08) : 1301 - 1323