Makespan-Minimizing Heterogeneous Task Allocation under Temporal Constraints

被引:0
|
作者
Jeong, Byeong-Min [1 ]
Oh, Yun-Seo [1 ]
Jang, Dae-Sung [2 ]
Hwang, Nam-Eung [3 ]
Kim, Joon-Won [3 ]
Choi, Han-Lim [1 ]
机构
[1] Korea Adv Inst Sci & Technol, Dept Aerosp Engn, Daejeon 34141, South Korea
[2] Korea Aerosp Univ, Sch Aerosp & Mech Engn, Goyang 10540, South Korea
[3] Hanwha Syst Co, Seongnam 13524, South Korea
关键词
multi-UAV system; constrained task allocation; makespan; temporal constraints; SYSTEMS;
D O I
10.3390/aerospace10121032
中图分类号
V [航空、航天];
学科分类号
08 ; 0825 ;
摘要
Task allocation is an essential element for determining the capability of multi-UAV systems to perform various tasks. This paper presents a procedure called a "rebalancing algorithm" for generating task-performing routes in heterogeneous multi-UAV systems. The algorithm adopts a greedy-based heuristic approach to find solutions efficiently in dynamically changing environments. A novel variable named "loitering" is introduced to satisfy temporal constraints, resulting in improved performance compared to heuristic algorithms: a sequential greedy algorithm, a genetic algorithm, and simulated annealing. The rebalancing algorithm is divided into two phases to minimize the makespan, i.e., the initial allocation and reallocation phases. Simulation results demonstrate the proposed algorithm's effectiveness in highly constrained conditions and its suitability for heterogeneous systems. Additionally, the results show a reduction in calculation time and improved performance compared to the heuristic algorithms.
引用
收藏
页数:16
相关论文
共 50 条
  • [31] A branch and bound algorithm for minimizing makespan on a single machine with unequal release times under learning effect and deteriorating jobs
    Toksari, M. Duran
    COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (09) : 1361 - 1365
  • [32] Optimal Path Planning under Temporal Logic Constraints
    Smith, Stephen L.
    Tumova, Jana
    Belta, Calin
    Rus, Daniela
    IEEE/RSJ 2010 INTERNATIONAL CONFERENCE ON INTELLIGENT ROBOTS AND SYSTEMS (IROS 2010), 2010,
  • [33] Two-machine job shop problem under availability constraints on one machine: Makespan minimization
    Benttaleb, Mourad
    Hnaien, Faicel
    Yalaoui, Farouk
    COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 117 : 138 - 151
  • [34] Secure Control Under Linear Temporal Logic Constraints
    Niu, Luyao
    Clark, Andrew
    2018 ANNUAL AMERICAN CONTROL CONFERENCE (ACC), 2018, : 3544 - 3551
  • [35] Reorganization of catching coordination under varying temporal constraints
    Mazyn, LIN
    Montagne, G
    Savelsbergh, GJP
    Lenoir, M
    MOTOR CONTROL, 2006, 10 (02) : 143 - 159
  • [36] Coordination for dynamic weighted task allocation in disaster environments with time, space and communication constraints
    Su, Xing
    Zhang, Minjie
    Bai, Quan
    JOURNAL OF PARALLEL AND DISTRIBUTED COMPUTING, 2016, 97 : 47 - 56
  • [37] Reliability-based Optimization aimed for Task Allocation in Heterogeneous Distributed Computing Systems
    Bahrami-Bidoni, Zeynab
    Shujaee, Khalil
    George, Roy
    2016 WORLD AUTOMATION CONGRESS (WAC), 2016,
  • [38] Minimizing task reassignments under balancing multi-product reconfigurable manufacturing lines
    Yelles-Chaouche, Abdelkrim R.
    Gurevsky, Evgeny
    Brahimi, Nadjib
    Dolgui, Alexandre
    COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 173
  • [39] TOWARDS A DISTRIBUTED SOLUTION TO MULTI-ROBOT TASK ALLOCATION PROBLEM WITH ENERGETIC AND SPATIOTEMPORAL CONSTRAINTS
    Zitouni, Farouq
    Harous, Saad
    Maamri, Ramdane
    COMPUTER SCIENCE-AGH, 2020, 21 (01): : 3 - 24
  • [40] Unrelated parallel machine scheduling under machine availability and eligibility constraints to minimize the makespan of non-resumable jobs
    Kurt, A.
    Cetinkaya, F. C.
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND MANAGEMENT, 2024, 15 (01): : 18 - 33