Performance Modeling and Estimation of Serial System Exhibiting k-out-of-n: G Scheme with Controller Failure

被引:2
|
作者
Ayagi, Hamisu Ismail [1 ,2 ]
Wan, Zhong [1 ]
Yusuf, Ibrahim [3 ]
Sanusi, Abdullah [4 ]
Musa, Mus'abu [5 ]
机构
[1] Cent South Univ, Sch Math & Stat, Changsha, Peoples R China
[2] Yusuf Maitama Sule Univ, Dept Math, Kano, Nigeria
[3] Bayero Univ, Dept Math Sci, Kano, Nigeria
[4] Bayero Univ, Sch Continuing Educ, Kano, Nigeria
[5] Kebbi State Univ Sci & Technol, Fac Phys Sci, Dept Math, Aliero, Kebbi, Nigeria
关键词
Availability; Controller; Exhibiting; Performance; Reliability; System; Scheme; RELIABILITY; REPLACEMENT; SUBJECT;
D O I
10.59038/jjmie/170202
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
The k-out-of-n system is a widely used concept in various fields. The significance of this system lies in its ability to ensure reliability, safety, and continuity of operation in various settings, including home appliances, military equipment, communication networks, and manufacturing systems. The system consists of two subsystems, each of which employs the k -out-of-n: G scheme. Our aim is to estimate the performance of a system that implements a k-out-of-n: G scheme with a controller using Copula's properties. This system is susceptible to two types of failures; partial and complete failures. If the system fails partially, it is repaired using General repair techniques while completely failed state is repaired using Copula repair techniques. The system is investigated using supplementary variable techniques and the Laplace transformation to obtain explicit expressions for availability, reliability, mean time to failure (MTTF), sensitivity, and expected profit functions, all of which are numerically validated. The outcomes/results are displayed in tables and figures, enabling us to draw the appropriate conclusions and offer recommendations. On the basis of numerical results, the conclusions were drawn. The findings of this study will aid maintenance managers in determining the appropriate time and technique for a system's maintenance.& COPY; 2023 Jordan Journal of Mechanical and Industrial Engineering. All rights reserved
引用
收藏
页码:155 / 181
页数:27
相关论文
共 50 条
  • [1] Reliability Estimation of k-Out-of-n: G System With Model Uncertainty
    Gao, Ziwen
    Yu, Dalei
    Zhang, Xinyu
    IEEE TRANSACTIONS ON RELIABILITY, 2024, 73 (02) : 978 - 989
  • [2] Parameter Estimation for a k-out-of-n: F System
    Duan Qihong
    Liu Junrong
    COMMUNICATIONS IN STATISTICS-SIMULATION AND COMPUTATION, 2014, 43 (01) : 99 - 114
  • [3] Reliability of a k-out-of-n:G System with Identical Repairable Elements
    Sharifi, M.
    Nia, A. Torabi
    Shafie, P.
    Norozi-Zare, F.
    Sabet-Ghadam, A.
    NUMERICAL ANALYSIS AND APPLIED MATHEMATICS, VOLS 1 AND 2, 2009, 1168 : 385 - +
  • [4] Optimal inspection and maintenance for a repairable k-out-of-n: G warm standby system
    Wu, Hui
    Li, Yan-Fu
    Berenguer, Christophe
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2020, 193
  • [5] Performance assessment of the complex repairable system with n-identical units under (k-out-of-n: G) scheme and copula linguistic repair approach
    Singh, V. V.
    Mohhammad, Abubakkar Idris
    Ibrahim, Kabiru Hamisu
    Yusuf, Ibrahim
    INTERNATIONAL JOURNAL OF QUALITY & RELIABILITY MANAGEMENT, 2022, 39 (02) : 367 - 386
  • [6] Mean Time to Failure of Weighted k-out-of-n: G Systems
    Eryilmaz, Serkan
    COMMUNICATIONS IN STATISTICS-SIMULATION AND COMPUTATION, 2015, 44 (10) : 2705 - 2713
  • [7] Stochastic Assessment of k Operational State System with k-out-of-n:G Working Scheme with Employing Copula Repair Approach
    Ayagi, Hamisu Ismail
    Singh, V. V.
    Wan, Zhong
    INTERNATIONAL JOURNAL OF RELIABILITY QUALITY AND SAFETY ENGINEERING, 2023, 30 (02)
  • [8] Joint optimal inspection and inventory for a k-out-of-n system
    Bjarnason, Erik T. S.
    Taghipour, Sharareh
    Banjevic, Dragan
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2014, 131 : 203 - 215
  • [9] Reliability of a consecutive k-out-of-n: G system with protection blocks
    Fang, Shu
    Yu, Rongquan
    Wu, Di
    Peng, Rui
    INTERNATIONAL JOURNAL OF GENERAL SYSTEMS, 2024,
  • [10] k-out-of-n:: G system with repair:: the D-policy
    Krishnamoorthy, A
    Ushakumari, PV
    COMPUTERS & OPERATIONS RESEARCH, 2001, 28 (10) : 973 - 981